flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A new animal services center in California reflects current care trends

Government Buildings

A new animal services center in California reflects current care trends

The Center includes the region’s only place set up to shelter and rehab large livestock.


By John Caulfield, Senior Editor | March 4, 2021
The entrance to the Santa Clara Animal Services Center in California

The Santa Clara (Calif.) Animal Services Center, which has one of the highest levels of all-intake shelters in the state, has moved into a new, larger facility that will double its annual capacity. Images: County of Santa Clara

Animal shelters have come a long way from the days when, for many cats, dogs, and other animals, they were little more than waystations to euthanasia.

Case in point: the 37,000-sf County of Santa Clara Animal Services Center, which opened last month on eight acres in San Martin. Calif., represents the current era’s more humane approach to caring for abandoned or in-need creatures.

Designed by Dreyfuss + Blackford Architecture in collaboration with the Florida-based animal care designer Bacon Group, and constructed by XL Construction, the Center allows the county’s animal care team to double, to 8,000, the number of pets it can care for annually. The building features advanced medical clinics, cat “condos” and dog “dorms,” specialized outdoor rehab space, and emergency shelter capacity for community pets.

 

IN THE WORKS FOR 10 YEARS

The Center is the only shelter in the county that takes in livestock. Its history of care includes adoption and volunteer programs.

 

The County’s previous animal shelter in San Martin was in an expanded, repurposed farmhouse built 40 years ago. But even the older shelter had a 95% live release rate, ranking it at the top among public shelters in California. With its new Animal Services Center, the County is committed to saving all animals, even when the shelter is full. The Center is “open admission,” meaning all animals are accepted from County service areas, regardless of temperament and condition.

The County and its Building Team have been planning and working on this project for more than a decade. The county’s board of supervisors approved the contract with Dreyfuss + Blackford Architecture in February 2017. In June 2018, the board awarded a $31,452,406 CM at Risk contract to XL Construction with 240 calendar days of preconstruction and 580 days of construction. The County subsequently increased the guaranteed maximum price of the project by $3,917,669, and the construction phase was completed in 18 months.

 

READY FOR ANIMALS OF ALL SIZES

The Center's design took its cue from a number of certification programs.

The Center's design was informed by principles for healthier buildings, energy efficiency, and minimizing animal anxiety.

 

The design of the new Center in San Martin draws from WELL Building principles, LEED green building standards, and Fear Free anti-anxiety concepts for pets. The facility includes a medical expansion for advanced veterinary care clinics with exam rooms, radiology, surgery, and recovery suites. Its amenities include a 2,500-sf barn with 10 stalls and extensive pastures that are among the few facilities in the region outfitted to shelter and rehabilitate large livestock. An indoor/outdoor community meeting space can accommodate up to 300 people for events.

XL’s contributions to this project included the application of advanced safety and disease control methods such as zoned air flow and sophisticated trench drain and chemical washdown systems. XL built with durable specialty materials—such as polished and sealed concrete and epoxy-coated floors, structural glazed tile and block walls, plastic toilet partitions, and Caesarstone countertops—that require little maintenance outside of regular topical cleaning.

Related Stories

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

| Nov 10, 2011

Suffolk Construction awarded MBTA transit facility and streetscape project

The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021