The American Institute of Architects has released a new standard contract form to accommodate architects’ facility support services.
AIA Document B210–2017 is meant to be added to owner-architect agreements where architects provide services including building certification assistance, maintenance management services, digital facility management system operation, and ongoing commissioning services. The new form can be used with AIA Document B102–2017, Standard Form of Agreement Between Owner and Architect, to provide the Architect’s sole scope of services.
It can also be used with B102–2017 in conjunction with other standard form services documents. The new form may also be incorporated into any owner-architect agreement when the agreement is used with G802–2017, Amendment to the Professional Services Agreement, to create a modification to any owner-architect agreement.
The new form provides a table that offers a broad listing of possible facility support services and can serve as a discussion guide for architects and owners to establish the final scope of services. Some of the services included in the scope of work go beyond traditional architectural services. The architect should thus consult with a professional liability insurance provider to find out if the non-traditional services are covered in the architect’s policy before beginning these services, AIA advises.
AIA contract documents may require modification to comply with state or local laws. Users should consult an attorney before completing or modifying a document, AIA says.
For more information, visit: www.aiacontracts.org.
Related Stories
Smart Buildings | Jul 12, 2015
Office of Management and Budget asks agencies to consider climate change when budgeting for construction projects
For the first time, the U.S. Office of Management and Budget is asking agencies to submit budget plans that consider the effects of climate change on construction and maintenance of federal facilities.
Engineers | Jul 12, 2015
White paper explores low-flow toilets’ impact on drain lines, clogs
The research found that certain variables: toilet paper—along with the pipe slope and flush volume—are key variables in determining whether drain lines might be predisposed to clog.
Contractors | Jul 9, 2015
Opioid abuse blamed for increase in worker injuries, business losses
Insurance giant CNA says concerns are increasing in the construction industry.
Codes and Standards | Jul 8, 2015
California Supreme Court upholds affordable housing requirements
Court cites affordable housing crisis of ‘epic proportions.’
Codes and Standards | Jul 6, 2015
First valuation advisory for green and high performance property adopted
The document provides voluntary guidance to appraisers on the background and competency necessary to credibly value green buildings.
Codes and Standards | Jun 24, 2015
Maryland’s Prince George County turns to P3s to build green infrastructure
Over the next 10 years, the county must convert 15,000 acres of watertight surfaces—almost 5% of the county's total area—into surfaces that absorb or treat rainwater.
Codes and Standards | Jun 24, 2015
Philadelphia considers more incentives for green building
Developers could be allowed additional height, floor area on projects that meet benchmarks.
Codes and Standards | Jun 24, 2015
LEED building at Duke University may be retrofitted to prevent bird deaths
More birds die from colliding with buildings at Duke than on any other campus in a 45-school survey conducted by Augustana College. Duke is located along the Atlantic Flyway, a bird migration route.
Codes and Standards | Jun 24, 2015
Balcony collapse in Berkeley, Calif., prompts an examination of codes
Dry rot and too much weight appear to be the causes of a fatal accident at an eight-year-old building in Berkeley, Calif.
Codes and Standards | Jun 18, 2015
Guides to wood construction in high wind areas updated
The guides establish prescriptive, wind-resistive structural requirements for wood-frame buildings of different sizes and shapes.