flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

The Rhonda & Howard Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.


By Novid Parsi, Contributing Editor | March 11, 2024
Southeast aerial view of the Joslyn Art Museum. Rendering courtesy Moare
Southeast aerial view of the Joslyn Art Museum. Rendering courtesy Moare

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

The Hawks Pavilion extends from the Museum’s existing buildings as a curving, low-slung structure that emerges from a new glass entry atrium joining the original 1931 building with the 1994 addition. The transparent first floor also will enclose a new museum shop and community space. As it twists upward, the structure forms the walls of the Hawks Pavilion’s second-floor, day-lit exhibition galleries.

Snøhetta’s plan for the Joslyn Art Museum

Snøhetta’s design of the expansion aims to evoke the cloud formations above the Great Plains, as well as the deep overhangs and horizontal expression of Prairie School architecture.

In addition, visitors will encounter new and refurbished gathering spaces, renovated and additional studios, enhanced amenities for public programs and art education, and new sculpture gardens. The project also updates the 1931 building’s administrative area and renovates the existing cafe.

The Hawks Pavilion will offer the first public presentation of new acquisitions from the Phillip G. Schrager Collection, which the Joslyn says is perhaps the most significant gift of art it has received. The Pavilion’s works on paper gallery will present selections from a gift by Omaha native Ed Ruscha.

After the reopening, the Joslyn will feature the first complete reinstallation of the Museum’s collections since the original building opened. The reinstallation will emphasize the relevance of art and historical objects to contemporary issues and diversify the identities and experiences represented in the galleries.

On the Building Team:
Owner: Joslyn Art Museum
Design architect and landscape architect: Snøhetta
Architect of record: Alley Poyner Macchietto Architecture
MEP engineer: Morrissey Engineering
Structural engineer: MKA
Structural engineer of record: Thompson Dreessen & Dorner
General contractor: Kiewit Building Group

Hawks Pavilion entry atrium with views of the Joslyn Building, Scott Pavilion, and arrival garden. Rendering courtesy Moare
Hawks Pavilion entry atrium with views of the Joslyn Building, Scott Pavilion, and arrival garden. Rendering courtesy Moare
Interior twist connection looking into the new Hawks Pavilion from the glass atrium that connects it to the Joslyn Building and Scott Pavilion. Rendering courtesy Moare
Interior twist connection looking into the new Hawks Pavilion from the glass atrium that connects it to the Joslyn Building and Scott Pavilion. Rendering courtesy Moare
South garden view of the Joslyn Art Museum. Rendering courtesy Moare
South garden view of the Joslyn Art Museum. Rendering courtesy Moare
East elevation of the Joslyn Building, Hawks Pavilion, central lawn, and courtyard garden. Rendering courtesy Moare
East elevation of the Joslyn Building, Hawks Pavilion, central lawn, and courtyard garden. Rendering courtesy Moare
Gallery view inside the new Hawks Pavilion, rendering courtesy Moare
Gallery view inside the new Hawks Pavilion, rendering courtesy Moare
Northwest view of the new Hawks Pavilion entry drive. Rendering courtesy Moare
Northwest view of the new Hawks Pavilion entry drive. Rendering courtesy Moare

 

Related Stories

| Jul 26, 2013

How biomimicry inspired the design of the San Francisco Museum at the Mint

When the city was founded in the 19th century, the San Francisco Bay’s edge and marshland area were just a few hundred feet from where the historic Old Mint building sits today. HOK's design team suggested a design idea that incorporates lessons from the local biome while creating new ways to collect and store water.

| Jul 22, 2013

Cultural Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 2, 2013

LEED v4 gets green light, will launch this fall

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.

| Jul 1, 2013

Report: Global construction market to reach $15 trillion by 2025

A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.

| Jun 28, 2013

Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report

A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals. 

| Jun 25, 2013

Mirvish, Gehry revise plans for triad of Toronto towers

A trio of mixed-use towers planned for an urban redevelopment project in Toronto has been redesigned by planners David Mirvish and Frank Gehry. The plan was announced last October but has recently been substantially revised.

| Jun 25, 2013

DC commission approves Gehry's redesign for Eisenhower memorial

Frank Gehry's updated for a new Dwight D. Eisenhower memorial in Washington, D.C., has been approved by the Eisenhower Memorial Commission, reports the Washington Post. The commission voted unanimously to approve the $110 million project, which has been gestating for 14 years.

boombox1
boombox2
native1

More In Category



Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.


Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021