flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nearly half of nonresidential construction projects now delivered by design-build

Codes and Standards

Nearly half of nonresidential construction projects now delivered by design-build

‘Alternative’ method now mainstream for nonresidential, highway/street, and water/wastewater construction projects.


By Peter Fabris, Contributing Editor | June 29, 2018

New research by FMI shows that nearly half of non-residential construction projects are being delivered by the design-build method.

Design-build is the fastest growing and most popular method to deliver nonresidential, highway/street, and water/wastewater construction projects in America. Among the key findings of the new research are:

— Design-build is anticipated to account for 44% of construction spending in the assessed segments (nonresidential, highway/street and water/wastewater) delivering $1.2 trillion in construction put in place by 2021.

— Design-build spending is anticipated to grow 18% overall, with the highway/street and water/wastewater sectors seeing 30% growth by 2021.

— Design-build spending in Manufacturing (16%), Highway/Street (14%), and Educational (15%) represent the greatest percentage of design-build construction spending by segment from 2018-2021.

— Experience with design-build was rated highest across all project delivery methods, with 76% of survey respondents reporting very good and excellent experiences.

— Opportunities to innovate and the ability to fast track a project were identified as top benefits associated with design-build.

Related Stories

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021