flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nearly $1 billion earmarked for energy efficiency upgrades to federal buildings

Government Buildings

Nearly $1 billion earmarked for energy efficiency upgrades to federal buildings

About 40 million sf, 20% of GSA’s federal buildings portfolio, will be impacted by the energy efficiency and clean energy upgrades.


By Peter Fabris, Contributing Editor | August 7, 2023
Nearly $1 billion earmarked for energy efficiency upgrades to federal buildings, Photo: Image by MotionStudios from Pixabay

Photo: Image by MotionStudios from Pixabay

The U.S. General Services Administration (GSA) recently announced plans to use $975 million in Inflation Reduction Act funding for energy efficiency and clean energy upgrades to federal buildings across the country.

The investment will impact about 40 million sf, or about 20% of GSA’s federal buildings portfolio. It will expand the agency’s sustainable building portfolio to 134 million sf. The projects will enable 28 buildings to achieve net zero emissions, and 100 more buildings to become all-electric. GSA currently has about 200 buildings that are all-electric.

The plans include electrifying the Ronald Reagan Building and International Trade Center, one of the largest structures in GSA’s portfolio. The work will include installation of heat pumps as the primary heating source, while eliminating onsite combustion emissions and the use of steam onsite for space and water heating. The project calls for installation of 57,000 LED light bulbs, upgrading over 500 high efficiency transformers, and installing a reverse osmosis groundwater recovery system that is estimated to save 35 million gallons of water annually. After work is completed, the Reagan Building is estimated to reduce energy usage by 40% and realize an estimated $6.3 million savings in energy costs annually.

GSA plans to tap into private sector funds through performance contracts such as Energy Savings Performance Contracts and Utility Energy Savings Contracts; make direct investments in building retrofits to maximize greenhouse gas reductions as well as energy and water savings; and expand building technology innovation programs such as the Green Proving Ground and Applied Innovation Learning Lab programs as well as electric vehicle infrastructure.

“The Inflation Reduction Act investments put GSA three-quarters of the way toward meeting the Federal Building Performance Standard released last year, which sets an ambitious goal to cut energy use while electrifying equipment and appliances in 30% of the building space owned by the federal government by 2030,” according to a GSA news release.

Related Stories

| Aug 6, 2013

Sarabjit Singh named President of ITSI Gilbane and Gilbane Global

Gilbane Building Company announced today the appointment of Sarabjit Singh, P.E. as the new president of ITSI Gilbane (soon to be Gilbane Federal) and Gilbane Global, subsidiaries of Gilbane Building Company. 

| Aug 6, 2013

CoreNet: Office space per worker shrinks to 150 sf

The average amount of space per office worker globally has dropped to 150 square feet or less, from 225 square feet in 2010, according to a recent global survey conducted by CoreNet Global.

| Jul 30, 2013

In support of workplace chatter

As the designers of collaborative work environments, architects and engineers understand how open, transparent spaces can cultivate the casual interaction and knowledge sharing that sparks innovation. Now a new study reveals another potential benefit of open workplaces: social interaction that supports happier employees. 

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 26, 2013

How biomimicry inspired the design of the San Francisco Museum at the Mint

When the city was founded in the 19th century, the San Francisco Bay’s edge and marshland area were just a few hundred feet from where the historic Old Mint building sits today. HOK's design team suggested a design idea that incorporates lessons from the local biome while creating new ways to collect and store water.

| Jul 22, 2013

Top Office Sector Construction Firms [2013 Giants 300 Report]

Turner, Structure Tone, PCL top Building Design+Construction's 2013 ranking of the largest office sector contractors and construction management firms in the U.S.

| Jul 22, 2013

Top Office Sector Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Jacobs top Building Design+Construction's 2013 ranking of the largest office sector engineering and engineering/architecture firms in the U.S.

| Jul 22, 2013

Top Office Sector Architecture Firms [2013 Giants 300 Report]

Gensler, HOK, Perkins+Will top Building Design+Construction's 2013 ranking of the largest office sector architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Construction Firms [2013 Giants 300 Report]

Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

boombox1
boombox2
native1

More In Category




Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021