flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nearly $1 billion earmarked for energy efficiency upgrades to federal buildings

Government Buildings

Nearly $1 billion earmarked for energy efficiency upgrades to federal buildings

About 40 million sf, 20% of GSA’s federal buildings portfolio, will be impacted by the energy efficiency and clean energy upgrades.


By Peter Fabris, Contributing Editor | August 7, 2023
Nearly $1 billion earmarked for energy efficiency upgrades to federal buildings, Photo: Image by MotionStudios from Pixabay

Photo: Image by MotionStudios from Pixabay

The U.S. General Services Administration (GSA) recently announced plans to use $975 million in Inflation Reduction Act funding for energy efficiency and clean energy upgrades to federal buildings across the country.

The investment will impact about 40 million sf, or about 20% of GSA’s federal buildings portfolio. It will expand the agency’s sustainable building portfolio to 134 million sf. The projects will enable 28 buildings to achieve net zero emissions, and 100 more buildings to become all-electric. GSA currently has about 200 buildings that are all-electric.

The plans include electrifying the Ronald Reagan Building and International Trade Center, one of the largest structures in GSA’s portfolio. The work will include installation of heat pumps as the primary heating source, while eliminating onsite combustion emissions and the use of steam onsite for space and water heating. The project calls for installation of 57,000 LED light bulbs, upgrading over 500 high efficiency transformers, and installing a reverse osmosis groundwater recovery system that is estimated to save 35 million gallons of water annually. After work is completed, the Reagan Building is estimated to reduce energy usage by 40% and realize an estimated $6.3 million savings in energy costs annually.

GSA plans to tap into private sector funds through performance contracts such as Energy Savings Performance Contracts and Utility Energy Savings Contracts; make direct investments in building retrofits to maximize greenhouse gas reductions as well as energy and water savings; and expand building technology innovation programs such as the Green Proving Ground and Applied Innovation Learning Lab programs as well as electric vehicle infrastructure.

“The Inflation Reduction Act investments put GSA three-quarters of the way toward meeting the Federal Building Performance Standard released last year, which sets an ambitious goal to cut energy use while electrifying equipment and appliances in 30% of the building space owned by the federal government by 2030,” according to a GSA news release.

Related Stories

| Sep 4, 2014

Ranked: Top courthouse sector AEC firms [2014 Giants 300 Report]

Fentress Architects, Tutor Perini, and AECOM top BD+C's rankings of design and construction firms with the most revenue from courthouse facilities, as reported in the 2014 Giants 300 Report.

| Sep 3, 2014

Ranked: Top local government sector AEC firms [2014 Giants 300 Report]

STV, HOK, and Turner top BD+C's rankings of the nation's largest local government design and construction firms, as reported in the 2014 Giants 300 Report.

| Sep 3, 2014

New designation launched to streamline LEED review process

The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

| Sep 1, 2014

Ranked: Top federal government sector AEC firms [2014 Giants 300 Report]

Clark Group, Fluor, and HOK top BD+C's rankings of the nation's largest federal government design and construction firms, as reported in the 2014 Giants 300 Report. 

| Aug 25, 2014

Restoration of quake-ravaged Atascadero City Hall affirms city’s strength [2014 Reconstruction Awards]

The landmark city hall was severely damaged by the San Simeon earthquake in 2003. Reconstruction renewed the building’s stability, restored its exterior, and improved the functionality of the interior. 

| Aug 21, 2014

Ranked: Top convention center AEC firms [2014 Giants 300 Report]

Gensler, AECOM, and Hunt Construction top BD+C's rankings of the nation's largest convention center design and construction firms.

| Aug 20, 2014

Seattle's King Street Station thoughtfully restored [2014 Reconstruction Awards]

After years of neglect and botched renovations, King Street Station sparkles once again.

| Aug 14, 2014

How workplace design can empower employees, businesses

Focusing on recent work at Follett and Zurich, CannonDesign’ Meg Osman reveals the power of research, strategy, change management, and measurement to transform businesses for the better.

| Aug 12, 2014

Design firms invited to submit qualifications for St. Petersburg, Fla., waterfront project

The city of St. Petersburg, Fla., invites firms to submit their ideas for a new and improved pier for Florida's fifth largest city.

boombox1
boombox2
native1

More In Category




Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021