flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

N.C.’s Outer Banks’ communities struggle for ways to keep the sea from overrunning them

Codes and Standards

N.C.’s Outer Banks’ communities struggle for ways to keep the sea from overrunning them

Tax hikes for beach replenishment offer temporary solution.


By Peter Fabris, Contributing Editor | March 25, 2021

Courtesy Pixabay

Communities along North Carolina’s Outer Banks are grappling with how to prevent beaches, and ultimately the settlements themselves, from washing away.

One solution, beach replenishment in which sand is harvested offshore and pumped onto eastern-facing beachfronts, is a costly, temporary measure. The Town of Avon, with a few hundred full-time residents, needs at least $11 million to stop its main road from washing away.

To raise the funds, Dare County proposed increasing Avon’s property taxes by almost 50% for some residents. But that plan would only stave off the problem for about five years. Other communities along the Outer Banks face similar challenges.

In light of major storms that have pummeled the sandbar island chain in recent years, along with rising sea levels, some suggest the government would be better served to pay residents to relocate inland. One Avon resident quoted in a New York Times Magazine article said he is telling his children to leave the community.

Related Stories

| Apr 26, 2012

Developers can use LEED wastewater credits to help gain approvals in environmentally sensitive locales

Those wanting to pursue development in heavily regulated and environmentally sensitive areas are benefiting by designing projects that qualify for LEED points, even if the project as a whole does not achieve certification.

| Apr 26, 2012

New York City Council moves to license elevator mechanics

New York’s City Council introduced a measure last week that would require the city’s 7,000 elevator mechanics to meet national standards and be licensed by the city.

| Apr 23, 2012

AAMA releases updated specification for anodized aluminum

AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.

| Apr 19, 2012

Michigan legislature tackling controversial rules on electricians

A fight is brewing in the Michigan legislature over how many fully qualified electricians must be present during electrical work when apprentices also are on hand.

| Apr 19, 2012

Washington city may base building code on rising sea level due to global warming

Aberdeen may become the first city in Washington to base a building code on rising oceans and global warming.

| Apr 19, 2012

CSI webinar on energy codes and building envelopes

This seminar will review recent changes in energy codes, examples of building enclosure wall assemblies for code compliance, potential moisture management and durability challenges, and design tools to assess and minimize potential problems.

| Apr 19, 2012

Innovative plan for storm water in Philadelphia gets EPA’s OK

Philadelphia's $2 billion plan to manage its storm water with green methods including porous pavement, green roofs, and more trees, was officially approved last week by the U.S. Environmental Protection Agency.

| Apr 19, 2012

LEED 2012 to include new credit category for transit-oriented development

The updated LEED 2012 system will introduce a new credit category, “Location and Transportation,” to encourage development oriented around public transit and more walkable communities.

| Apr 17, 2012

FMI report examines federal construction trends

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021