flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NCARB study: Architects getting licensed at younger age

NCARB study: Architects getting licensed at younger age

A new report from NCARB shows that the median age of people at initial licensure is at a 10 year low.


By NCARB | June 19, 2014
The National Council of Architectural Registration Boards (NCARB) has announced the publication of its statistical report on architectural licensing, NCARB By the Numbers.
 
In its third year of publication, this year’s NCARB by the Numbers offers a compelling perspective on individuals who are on the path to becoming licensed.
 
In addition to page-by-page graphics and descriptions of key findings, NCARB offers a deep dive that examines the demographics of those entering the profession, providing insight about the length of time it takes to get licensed, and highlights details related to the process.
 
A major finding in this year’s report is that the median age of people at initial licensure is at a 10 year low. This means architects are getting licensed at a younger age.
 
The report also indicates an increase since 2011 in the number of women applying for NCARB Records. The percentage of women applying for NCARB Records continues to hold around 40 percent—a marked increase from 10 percent in the early 1990s.
 
NCARB’s CEO Mike Armstrong states, “The report’s findings serve as a foundation for our ongoing efforts to lead change in the path to an architectural license. The entry point into the profession is changing, and NCARB is adapting to meet shifting demands. Our indicators document a profession that is thriving.”
 
 

Related Stories

| Sep 24, 2012

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.

| Sep 21, 2012

AAMA and WDMA release updated review and forecast that predicts industry trends

Significant volume is expected to return to the entry and interior door market as new construction demand is expected to grow at double-digit rates, outpacing remodeling and replacement activity as the housing market recovers.

| Sep 20, 2012

Mid-box retail study shows lack of available sites in Chicago

Existing supply is tight everywhere and almost non-existent in the most attractive zones.

| Sep 20, 2012

Forrester begins construction of freestanding cancer center in Montgomery County, Md.

The new 51,000-square-foot building will include two linear accelerator vaults for radiation equipment.

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Sep 19, 2012

ABI back into positive territory

South continues to lead regions in demand for design services.

| Sep 19, 2012

HGA Architects & Engineers moves offices in San Francisco

HGA’s San Francisco office has grown by nearly 25% in the past two years, adding shared expertise to the 120-person California practice, which includes the Sacramento and Los Angeles offices.

| Sep 19, 2012

Sasaki opens office in Shanghai

Office supports firm’s present and future work in China, throughout Asia.

| Sep 18, 2012

MBMA partners with ORNL for whole building energy efficiency study

The results are intended to advance energy efficiency solutions for new and retrofit applications.

| Sep 18, 2012

MKK opens office in North Dakota

MKK is currently working on seven projects in North Dakota, including a hotel, restaurant, truck stop, office building, and apartment complex.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021