flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nauset Construction completing sustainable dorm for Brooks School

Nauset Construction completing sustainable dorm for Brooks School

Student input on green elements provides learning experience.


By Posted by Tim Gregorski, Senior Editor | June 8, 2012

As the school year draws to a close, Nauset Construction will be putting the final touches on the newly constructed, environmentally-friendly 22-bedroom dormitory for Brooks School in North Andover, an independent college preparatory boarding and day school for grades 9-12.
In addition to providing additional housing, the $3.3 million project created a learning opportunity for the students, whose ideas for sustainability were incorporated into the project’s design.

Recently named Chace House in honor of a long time trustee, the dorm was designed with input from the Brooks Institute for Sustainability, a student summer program focused on reducing the school’s environmental impact. Chace House will incorporate a number of elements vital to reducing operating and maintenance costs, including a heating system with a natural gas-fired burner that is 97.5% efficient; a high-efficiency building envelope with superior insulation to prevent energy loss; individual room thermostats with an automated system that can be programmed remotely; energy management systems with occupancy sensors; a cupola that releases warm air on hot days; solar lighting tubes in hallways that create natural day lighting; low-flow water facilities (including composting toilets) to reduce sewage bills; and drought tolerant native exterior plantings and water-efficient landscaping.

The facility will also feature high efficiency double-paned windows, a zinc roof (which lasts 80-100 years and requires no maintenance), zinc and clapboard siding, and a combination of hardwood, carpet and vinyl-tile flooring materials making use of recycled products where possible. Extra-thick insulation and sound-proof walls will also be built into each room to reduce noise. In addition to the sustainable features, the project will also include a 600-square-foot common area big enough for all building residents to gather; an outdoor seating area for students to collaborate with dorm faculty; a rear patio for cookouts and gatherings; and a small lounge/study area for after-hours homework help. +

Related Stories

| Apr 23, 2013

Building material innovation: Concrete cloth simplifies difficult pours

Milliken recently debuted a flexible fabric that allows for concrete installations on slopes, in water, and in other hard to reach places—without the need for molds or mixing.

| Apr 23, 2013

Architects to MoMA: Don't destroy Williams/Tsien project

Richard Meier, Thom Mayne, Steven Holl, Hugh Hardy and Robert A.M. Stern are among the prominent architects who on Monday called for the Museum of Modern Art to reconsider its decision to demolish the former home of the American Folk Art Museum.

| Apr 22, 2013

Top 10 green building projects for 2013 [slideshow]

The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.

| Apr 19, 2013

Is LED lighting keeping its promises?

Lighting experts debate the benefits, drawbacks, and issues related to specifying LED fixtures.

| Apr 19, 2013

Must see: Shell of gutted church on stilts, 40 feet off the ground

Construction crews are going to extremes to save the ornate brick façade of the Provo (Utah) Tabernacle temple, which was ravaged by a fire in December 2010.

| Apr 18, 2013

Survey seeks info from managers of high-tech facilities

  The International Institute for Sustainable Laboratories (I2SL), and Laney College in Oakland California, a National Science Foundation-funded Building Efficiency for a Sustainable Tomorrow (BEST) Center, are collaborating to identify education and training needs and strategies for high-tech facility operators. 

| Apr 18, 2013

SOM, CASE team up to launch crowd-sourced apps library

SOM and CASE have formally launched AEC-APPS, the first crowd-sourced, web-based library for applications used by architects, engineers and construction professionals. This is a one-of-a-kind initiative in the AEC Industry and is a non-profit online community that allows digital tool users and toolmakers to share ideas, tips and resources.

| Apr 18, 2013

Calatrava projects encounter issues with water, structure, Guardian says

A dozen years after Calatrava built the spectacular Ysios winery in the rainy Alava region of northern Spain, the building's dramatic, undulating roof continues to let in the damp.

| Apr 17, 2013

Frank Lloyd Wright's Park Avenue showroom demolished

New York loses another architectural gem by Frank Lloyd Wright as new owner razes auto showroom.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021