Nauset Construction Corp. has broken ground on a 72,000 sf healthcare facility in Danvers, Mass. for College Street Partners, an advisory and development firm specializing exclusively in healthcare real estate.
The $20 million project, which will be known as the Hathorne Hill Rehabilitation Center, began initial site work in August, with construction scheduled to be completed by December 2012. College Street officials expect the center to be able to serve patients and residents by the summer of 2013.
The building itself will feature a personalized model of care developed by JSA and SunBridge that embraces a shift in healthcare culture. The center will feature three distinct “neighborhoods” that will accommodate up to 40 patients each. The neighborhood settings showcase home-like amenities such as fireplaces, with access to outdoor spaces and attractive courtyard settings. BD+C
Related Stories
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.
| May 23, 2012
MBI Modular Construction Campus Launched on BDCUniversity.com
White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.