Nauset Construction recently completed construction of a significant renovation, addition and site improvements to The Gables at Winchester, an integrated independent and assisted living retirement community owned and operated by Five Star Senior Living of Newton, Mass.
Designed by architectural firm Levi + Wong Design Associates Inc., the 40,000 square foot project elevates the senior living experience by including a stadium-style theater, library, fitness center, and a bistro within the campus of the wooded location. The multi-million dollar project was completed in three phases over a fourteen-month period to minimize disruptions to the residents of The Gables.
The addition includes a theater/media room with state-of-the art movie equipment and sound system and fixed, stadium style seating. A new activity room with a grand main entrance was constructed featuring traditional architectural details with high end finishes.
Additional improvements included a new beauty salon, an exercise room outfitted with the latest in fitness equipment, an elegant dining room and beautifully landscaped outdoor patios with stone wall seats, blue stone in-lays and warm exterior lighting. The project required extensive site preparation, and included the installation of a mat foundation to accommodate the steel and wood frame construction. Concrete retaining walls were constructed and new mechanical, electrical and fire alarm systems were installed throughout the existing facility. BD+C
Related Stories
Market Data | Jan 30, 2018
AIA Consensus Forecast: 4.0% growth for nonresidential construction spending in 2018
The commercial office and retail sectors will lead the way in 2018, with a strong bounce back for education and healthcare.
Architects | Jan 29, 2018
14 marketing resolutions AEC firms should make in 2018
As we close out the first month of the New Year, AEC firms have made (and are still making) plans for where and how to spend their marketing time and budgets in 2018.
Education Facilities | Jan 29, 2018
My day as a kindergartner
TheĀ idea of a kindergarten-only school presents both challenges and opportunities in regards to the design.
AEC Tech | Jan 29, 2018
thyssenkrupp tests self-driving robot for ālast mileā delivery of elevator parts
āWith driverless delivery robots, we could fill a gap and get spare parts from our warehouses to the jobsite faster,ā said thyssenkrupp SVP Ivo Siebers.
Architects | Jan 26, 2018
Stephen Ayers, FAIA, honored with the 2018 AIA Thomas Jefferson Award
The award honors significant contributions to public architecture.
Architects | Jan 26, 2018
Recipients for the 2018 Collaborative Achievement Award selected
The recipients will be honored at the AIA Conference on Architecture 2018 in New York City.
K-12 Schools | Jan 25, 2018
Cost estimating for K-12 school projects: An invaluable tool for budget management
Clients want to be able to track costs at every stage of a project, and cost estimates (current and life cycle) are valuable planning and design tools, writesĀ LS3P'sĀ Ginny Magrath, AIA.
Architects | Jan 25, 2018
Four keys to designing autistic-friendly spaces
Autism, in part, gave us modern architecture, writes PDRās Julie Troung.
Sports and Recreational Facilities | Jan 25, 2018
Virginia Beach: A surf town with a wave problem no more
A world-class surf park will highlight Virginia Beachās new live-work-play development.
Multifamily Housing | Jan 24, 2018
Apartment rent rates jump 2.5% in 2017, led by small and mid-sized markets
The average price for one-bedroom units increased the most.