flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nationwide retrofit strategy in Canada could cut 51% of emissions from large buildings

Codes and Standards

Nationwide retrofit strategy in Canada could cut 51% of emissions from large buildings

The roadmap provides government and industry with a targeted plan.


By Peter Fabris, Contributing Editor | October 2, 2017
The Toronto skyline at night
The Toronto skyline at night

A nationwide retrofit strategy could cut 51% of emissions from large buildings in Canada, according to a new Canada Green Building Council (CaGBC).

The report includes recommendations that CaGBC says would reduce 21 million tons of carbon by 2030, help the government achieve its climate change goals, and grow the economy. CaGBC researchers analyzed how the type, size, and age of large buildings, along with energy sources and the carbon intensity of regional electrical grids in Canada, can affect energy efficiency and carbon emissions.

Among the findings and recommendations:

  • Buildings including office buildings, shopping malls, universities, and arenas constructed between 1960 and 1979 represent the age class with the largest opportunity for carbon emissions reductions.
  • Alberta and Ontario currently emit the most carbon. This is due to the carbon intensity of Alberta’s electricity grid and the number of large buildings in Ontario.
  • All provinces will need to prioritize recommissioning for large buildings (between 25,000 sf and 200,000 sf) and deep retrofits for buildings over 35 years old. These two actions will reduce emissions by 4.1 MT CO2e, providing 62% of the reduction needed to meet the goal.
  • Fuel switching must be completed in 20% of buildings over 35 years old across Canada. Currently, fuel switching is particularly attractive in provinces with clean electricity grids such as British Columbia, Manitoba, Quebec, New Brunswick, and Newfoundland. In these regions, significant effort should be put into increasing the adoption of highly efficient heat pump technology.
  • In provinces with carbon intense electricity grids—Alberta, Saskatchewan, New Brunswick, and Nova Scotia—30% of buildings will need to use renewable energy in order to meet the target.

Related Stories

| Aug 30, 2012

Public comment period is open for CRRC-1 standard

The CRRC-1 standard covers specimen preparation and test methods for measuring the initial and aged solar reflectance and thermal emittance of roofing products.

| Aug 30, 2012

LEED system's footprint reaches 2 billion sf, with 7 billion sf in the pipeline

About 7 billion more sf of commercial space is expected in the pipeline.

| Aug 30, 2012

Georgia drops LEED wood source standard on state projects

Currently, LEED green building standards only accept timber products certified by the Forest Stewardship Council (FSC).

| Aug 21, 2012

AGC offers second edition of the Federal Government Contractor: Ethics & Compliance Programs manual

This publication helps contractors appreciate the grounds for an alleged violation of the expected standards of business conduct and ethics, and to develop, implement, and document an effective ethics and compliance program.

| Aug 21, 2012

Federal Safe Building Code Incentive Act’s bipartisan support, no notable objection, bodes well for passage

The Safe Building Code Incentive Act would give states a little extra post-disaster federal funding if they enacted and enforced nationally recognized building codes for businesses and residences before disaster strikes.

| Aug 16, 2012

New York’s Barclays Center project accused of ignoring noise, pollution regulations

Construction crews racing to finish the Brooklyn Barclays Center are ignoring strict regulations to reduce noise and pollution, a new report by critics has found.

| Aug 16, 2012

Harness saves life of worker cleaning Washington state Capitol

Fall-protection equipment helped save the life of a worker who was cleaning the Washington state Capitol building in Olympia, after the platform he was using gave way.

| Aug 16, 2012

CSI webinar on August 21 focuses on electronic energy control

The Construction Specifications Institute (CSI) is sponsoring a free webinar on August 21 at 2:00 p.m. (EDT) on electronic energy control.

| Aug 16, 2012

Public sector pushes sustainable building forward

Not usually noted for its innovation, the public sector has done the most to advance sustainable building, according to a recent panel of green building professionals.

| Aug 16, 2012

Canada’s first net-positive building under construction in Milton, Ontario

The GreenLife Business Centre in Milton, Ontario near Toronto is set to become the first net-positive energy building in Canada.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021