flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nationwide retrofit strategy in Canada could cut 51% of emissions from large buildings

Codes and Standards

Nationwide retrofit strategy in Canada could cut 51% of emissions from large buildings

The roadmap provides government and industry with a targeted plan.


By Peter Fabris, Contributing Editor | October 2, 2017
The Toronto skyline at night
The Toronto skyline at night

A nationwide retrofit strategy could cut 51% of emissions from large buildings in Canada, according to a new Canada Green Building Council (CaGBC).

The report includes recommendations that CaGBC says would reduce 21 million tons of carbon by 2030, help the government achieve its climate change goals, and grow the economy. CaGBC researchers analyzed how the type, size, and age of large buildings, along with energy sources and the carbon intensity of regional electrical grids in Canada, can affect energy efficiency and carbon emissions.

Among the findings and recommendations:

  • Buildings including office buildings, shopping malls, universities, and arenas constructed between 1960 and 1979 represent the age class with the largest opportunity for carbon emissions reductions.
  • Alberta and Ontario currently emit the most carbon. This is due to the carbon intensity of Alberta’s electricity grid and the number of large buildings in Ontario.
  • All provinces will need to prioritize recommissioning for large buildings (between 25,000 sf and 200,000 sf) and deep retrofits for buildings over 35 years old. These two actions will reduce emissions by 4.1 MT CO2e, providing 62% of the reduction needed to meet the goal.
  • Fuel switching must be completed in 20% of buildings over 35 years old across Canada. Currently, fuel switching is particularly attractive in provinces with clean electricity grids such as British Columbia, Manitoba, Quebec, New Brunswick, and Newfoundland. In these regions, significant effort should be put into increasing the adoption of highly efficient heat pump technology.
  • In provinces with carbon intense electricity grids—Alberta, Saskatchewan, New Brunswick, and Nova Scotia—30% of buildings will need to use renewable energy in order to meet the target.

Related Stories

| Dec 26, 2013

USGBC recognizes Ohio for achieving 100th LEED-certified public school

The U.S. Green Building Council (USGBC) has recognized the state of Ohio and the Ohio School Facilities Commission (OSFC) on the LEED certification of the 100th public school building in the state. 

| Dec 26, 2013

WDMA launches project to create ISO-compliant architectural doors

WDMA's National Architectural Door Council has initiated a project to create ISO-compliant Product Category Rules for architectural wood flush and stile and rail doors

| Dec 19, 2013

Defense Department okays Green Globes standard for DoD facilities

The Green Globes certification program from the Green Building Initiative can be used for the renovation and construction of Department of Defense facilities following agency endorsement.

| Dec 19, 2013

New York City proposal may boost standards for crane maintenance

New York City may boost maintenance standards for cranes operating in the city, including the addition of load cycle counters to record data regarding every lift that a crane performs.

| Dec 19, 2013

Lawmakers say EPA’s Energy Star standards lack transparency

A bipartisan group of lawmakers is raising concerns that the Environmental Protection Agency has not been transparent in drafting energy-efficiency standards under the Energy Star program.

| Dec 18, 2013

ASHRAE publishes 2013 thermal comfort standard

Major revisions for design and measurement of comfortable spaces are included in a newly published ASHRAE 2013 thermal comfort standard.

| Dec 11, 2013

Texas to require architects to be fingerprinted to get licensed

Starting January 1, 2014, architects who apply for an occupational license in Texas will have to share their fingerprints with the state.

| Dec 11, 2013

Province of Ontario is reviewing bill to require timely payments to contractors

Legislation is under review in the Province of Ontario that would mandate timely payments to contractors.

| Dec 11, 2013

Federal design-build proposal could make it easier for small businesses to land government contracts

The Design-Build Efficiency and Jobs Act, a bill pending in the U.S. House of Representatives, would streamline the bid and proposal process by requiring government agencies to use a two-step process when seeking design-build contracts for projects worth more than $750,000.

| Dec 11, 2013

NIST recommends tougher standards for tornado resilience

Buildings in tornado-prone areas should be constructed to withstand strong winds just as hurricanes are factored into building codes in coastal areas, says a federal report examining the 2011 killer tornado in Joplin, Mo.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021