Celebrations for the grand opening of the largest Thai Buddhist temple built outside of Thailand, constructed by Consigli Construction and designed by ARC/Architectural Resources Cambridge, were held on June in Raynham, Mass.
Hundreds of people attended a public ceremony celebrating the opening of the $60 million, 110,000 square-foot, Wat Nawamintararachutis NMR Meditation Center, which included self-guided tours and a luncheon. A private ceremony was also held, which included more than 500 monks, Thai dignitaries, donors, local and state officials and members of the project team.
The new retreat is topped by a 185 foot-high steeple-like chedi of brass that soars above the surrounding rural neighborhood. Consigli’s team of skilled craftsmen self-performed the installation of miles of cherry wood, marble, brass and gold in the interiors. Much of the finishes and artifacts were made in Thailand, including seven gold-clad bronze Buddhas. Hundreds of fiberglass lotus medallions covered in gold-leaf and tiny triangular mirrors adorn the temple ceilings. And, a three-story grand staircase features hand-crafted bronze stair railings.
“There are very few contractors I can imagine doing this project other than Consigli. It requires that special touch. The biggest thing was the need for flexibility and sensitivity in handling a lot of unusual finishes and thinking outside the usual parameters to adapt to this unique project. We have an excellent team from Consigli, and I couldn’t be happier,” said the Temple’s Project Director, Paul Chapple.
The complex holds a museum, meditation space, residence halls for monks, kitchens and a multi-purpose hall that accommodates up to 700, which surrounds the actual temple. The multi-purpose hall, where the grand opening was held, will be used for major Buddhist celebrations during the year. The local community will be able to use the hall for meetings and lectures dedicated to the cultural traditions of Thailand.
The Wat Nawamintararachutis NMR Meditation Center is dedicated to the life of His Majesty King Bhumibol Adulyadej, Rama IX, the King of Thailand, who was born at Mount Auburn Hospital in Cambridge, Massachusetts in December 1927, while his parents were students at Harvard Medical School and Simmons College.
Related Stories
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Eidco Construction bolsters Chicago office
Eldco hires Peterson and Vivoda as senior project managers.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 29, 2012
C.W. Driver opens new office, appoints Castillo regional SVP
Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.
| Feb 29, 2012
Carvalho appointed Shawmut Safety Director
He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system.