Celebrations for the grand opening of the largest Thai Buddhist temple built outside of Thailand, constructed by Consigli Construction and designed by ARC/Architectural Resources Cambridge, were held on June in Raynham, Mass.
Hundreds of people attended a public ceremony celebrating the opening of the $60 million, 110,000 square-foot, Wat Nawamintararachutis NMR Meditation Center, which included self-guided tours and a luncheon. A private ceremony was also held, which included more than 500 monks, Thai dignitaries, donors, local and state officials and members of the project team.
The new retreat is topped by a 185 foot-high steeple-like chedi of brass that soars above the surrounding rural neighborhood. Consigli’s team of skilled craftsmen self-performed the installation of miles of cherry wood, marble, brass and gold in the interiors. Much of the finishes and artifacts were made in Thailand, including seven gold-clad bronze Buddhas. Hundreds of fiberglass lotus medallions covered in gold-leaf and tiny triangular mirrors adorn the temple ceilings. And, a three-story grand staircase features hand-crafted bronze stair railings.
“There are very few contractors I can imagine doing this project other than Consigli. It requires that special touch. The biggest thing was the need for flexibility and sensitivity in handling a lot of unusual finishes and thinking outside the usual parameters to adapt to this unique project. We have an excellent team from Consigli, and I couldn’t be happier,” said the Temple’s Project Director, Paul Chapple.
The complex holds a museum, meditation space, residence halls for monks, kitchens and a multi-purpose hall that accommodates up to 700, which surrounds the actual temple. The multi-purpose hall, where the grand opening was held, will be used for major Buddhist celebrations during the year. The local community will be able to use the hall for meetings and lectures dedicated to the cultural traditions of Thailand.
The Wat Nawamintararachutis NMR Meditation Center is dedicated to the life of His Majesty King Bhumibol Adulyadej, Rama IX, the King of Thailand, who was born at Mount Auburn Hospital in Cambridge, Massachusetts in December 1927, while his parents were students at Harvard Medical School and Simmons College.
Related Stories
| Aug 8, 2013
Level of Development: Will a new standard bring clarity to BIM model detail?
The newly released LOD Specification document allows Building Teams to understand exactly what’s in the BIM model they’re being handed.
| Aug 8, 2013
Vertegy spins off to form independent green consultancy
St. Louis-based Vertegy has announced the formation of Vertegy, LLC, transitioning into an independent company separate from the Alberici Enterprise. The new company was officially unveiled Aug. 1, 2013
| Aug 5, 2013
Top Retail Architecture Firms [2013 Giants 300 Report]
Callison, Stantec, Gensler top Building Design+Construction's 2013 ranking of the largest retail architecture and architecture/engineering firms in the United States.
| Aug 5, 2013
Top Retail Engineering Firms [2013 Giants 300 Report]
Jacobs, AECOM, Henderson Engineers top Building Design+Construction's 2013 ranking of the largest retail engineering and engineering/architecture firms in the United States.
| Aug 5, 2013
Retail market shows signs of life [2013 Giants 300 Report]
Retail rentals and occupancy are finally on the rise after a long stretch in the doldrums.
| Aug 5, 2013
Top Retail Construction Firms [2013 Giants 300 Report]
Shawmut, Whiting-Turner, PCL top Building Design+Construction's 2013 ranking of the largest retail contractor and construction management firms in the United States.
| Aug 2, 2013
Michael Baker Corp. agrees to be acquired by Integrated Mission Solutions
Michael Baker Corporation (“Baker”) (NYSE MKT:BKR) announced today that it has entered into a definitive merger agreement to be acquired by Integrated Mission Solutions, LLC (“IMS”), an affiliate of DC Capital Partners, LLC (“DC Capital”).
| Jul 31, 2013
Hotel, retail sectors bright spots of sluggish nonresidential construction market
A disappointing recovery of the U.S. economy is limiting need for new nonresidential building activity, said AIA Chief Economist, Kermit Baker in the AIA's semi-annual Consensus Construction Forecast, released today. As a result, AIA reduced its projections for 2013 spending to 2.3%.
| Jul 30, 2013
Better planning and delivery sought for VA healthcare facilities
Making Veterans Administration healthcare projects “better planned, better delivered” is the new goal of the VA’s Office of Construction and Facilities Management.
| Jul 30, 2013
Healthcare designers get an earful about controlling medical costs
At the current pace, in 2020 the U.S. will spend $4.2 trillion a year on healthcare; unchecked, waste would hit $1.2 trillion. Yet “waste” is keeping a lot of poorly performing hospitals in business, said healthcare facility experts at the recent American College of Healthcare Architects/AIA Academy of Architecture for Health Summer Leadership Summit in Chicago.