flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nashville's newest residential tower will rise 416 feet

Multifamily Housing

Nashville's newest residential tower will rise 416 feet

Goettsch Partners is designing the project.


By David Malone, Associate Editor | May 8, 2020
Alcove's pool deck

All renderings courtesy Goettsch Partners

A new residential tower, dubbed Alcove, set to rise at 900 Church Street in Nashville will be the first residential building adjacent to the 17-acre Nashville Yards development.

Designed by Goettsch Partners, the new 34-story, 416-foot-tall tower will feature 356 units and total more than 375,800 sf. The building is designed as a series of stacked, shifted cubes organized in pairs on four levels. This arrangement opens up the inner sections of the project to create unique views and alcoves for building residents.

 

Nashville's Alcove residential tower

 

Currently, the 356 residential units are designed for flexibility as either apartments or condominiums with 32 studios, 224 one-bedroom units, and 100 two-bedroom units. The building facade uses an intricate window wall that features two varying shades of glazed panels, which frame floor-to-ceiling glass for each unit.

 

See Also: 'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification

 

Terrace space in Nashville's Alcove

 

The project will feature a number of rooftop amenities such as a game room, a business center, private dining with a catering kitchen, a lounge, and a pool deck. Signature amenity spaces will be placed within four wood-finished aluminum cutouts that feature communal outdoor terraces. Two of the 75-foot-tall terraces will face east toward the Nashville skyline while the other two will face west. The project will also feature package delivery and retrieval systems and two pools: a rooftop lap pool with a six-inch-deep sun shelf and a glass-bottom pool that overhangs the 27th floor amenity terrace on the building's west side.

Goettsch Partners is designing both the building and the interior layouts.

 

Street view of Nashville's Alcove

 

Related Stories

Mixed-Use | May 7, 2021

Mixed-use development tops out in Brooklyn’s Brownsville neighborhood

The project will bring 160 affordable housing units to the area.

Multifamily Housing | Apr 22, 2021

The Weekly Show, Apr 22, 2021: COVID-19's impact on multifamily amenities

This week on The Weekly show, BD+C's Robert Cassidy speaks with three multifamily design experts about the impact of COVID-19 on apartment and condo amenities, based on the 2021 Multifamily Amenities Survey.

Multifamily Housing | Apr 20, 2021

Two new residential towers set to rise in Nashville

Goettsch Partners is designing the buildings.

Multifamily Housing | Apr 14, 2021

Miami's Adela at MiMo Bay combines a residential building with an American Legion facility

The five-story residential building features 236 units and a new American Legions Facility for military veterans.

Multifamily Housing | Apr 2, 2021

250-unit rental building opens in Brooklyn

CetraRuddy designed the project.

Multifamily Housing | Mar 30, 2021

Bipartisan ‘YIMBY’ bill would provide $1.5B in grants to spur new housing

Resources for local leaders to overcome obstacles such as density-unfriendly or discriminatory zoning.

Multifamily Housing | Mar 30, 2021

ProCONNECT Multifamily, ProCONNECT Single-Family open for Developers, Builders, Architects

Sponsors and Attendees can still sign up for ProCONNECT Multifamily April 21-22, ProCONNECT Single-Family for May 18-19

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021