flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

My Micro NY will soon be New York's first micro-apartment building

Modular Building

My Micro NY will soon be New York's first micro-apartment building

The Manhattan modular building will be completed in December and will contain apartments with low rents, but small space.


By Mike Chamernik, Associate Editor | October 22, 2015
My Micro NY will soon be New York's first micro-apartment building

The concrete and steel modular units at My Micro NY are currently being stacked and bolted together. Renderings courtesy nArchitects

New York is known for its expensive and cramped living conditions. The city has a solution for one of those stigmas.

My Micro NY, the city's first micro-apartment building, will open shortly after construction is completion in December, Dezeen reports. The nine-story, 35,000-sf modular building is located in Manhattan’s Kips Bay neighborhood and was designed by nArchitects. 

While the median rental price for a one-bedroom apartment elsewhere in Manhattan is a whopping $3,400, market-rate units at My Micro NY start at $2,000. Affordable units will range from $950 to $1,492.

The catch, of course, is that the complex’s 55 units will range from 250 to 370 sf, with 10-foot ceilings. The apartments will have a Juliet balcony, a kitchen, a closet, and a combined living and sleeping area. To get some space, tenants will have access to a gym, lounge, roof terrace, and garden.

The modules are made of steel frames and concrete slabs. They are currently being stacked and bolted together.

My Micro NY also released a trailer for an upcoming documentary on the project.

 

My Micro New York - Trailer from Antti T Seppänen on Vimeo.

Related Stories

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

| Apr 13, 2012

Best Commercial Modular Buildings Recognized

Judges scored building entries on a number of criteria including architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete, while marketing pieces were judged on strategy, implementation, and quantifiable results. Read More

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Sep 29, 2011

Kohler supports 2011 Solar Decathlon competition teams

Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

boombox1
boombox2
native1

More In Category

Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021