flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M+W Group acquires LifeTek Solutions in America

M+W Group acquires LifeTek Solutions in America

 

Acquisition intended to strengthen M+W's technological and process expertise in the Life Sciences industry.


By BD+C Staff | March 29, 2013

 

The global engineering and construction company M+W Group has announced 
that their operations in the Americas have acquired 100% ownership of LifeTek 
Solutions, Inc. With this acquisition, M+W Americas also obtains LifeTek’s 
25% share in the exclusive SmartFit Modular BioSuites and FillSuites.
 
LifeTek’s team of industry recognized experts specialize in developing technically 
driven projects in the pharmaceutical and biotechnology communities. Adept in the 
design of equipment and arrangements for these projects, the LifeTek team has the 
operating, maintenance, design, construction, and qualification background that 
founds a thorough understanding of how best to compose a manufacturing process 
and ensure their customers success. Their exclusive SmartFit modular BioSuites 
and FillSuites cut delivery time in half while providing proven field-tested 
performance. 
 
“Emerging technologies in the Life Science industries are transforming the way 
therapeutics are manufactured. The synergy between M+W Group and LifeTek will 
bring a world of innovative technology and expertise to our clients, assisting them to 
embrace new processes and streamline project delivery.” said Rick Whitney, 
President and CEO of M+W Americas.
 
“We are very excited about this acquisition.” commented George Wiker, Principal of 
LifeTek. “Together, M+W Group and LifeTek will provide customers with unmatched 
engineering depth in a single-firm solution from concept to start-up.”
 
 
About M+W Group (www.mwgroup.net): M+W Group is the leading global engineering, 
construction and project management company in the fields of Advanced Technology 
Facilities, Life Science & Chemicals, Energy & Environment Technologies and High-Tech 
Infrastructure. From concept development to turnkey services the company manages projects 
of all sizes ensuring rapid realization, high quality standards and cost-effective completion. 
With its competence to link process and automation technologies and complex facilities to 
integrated solutions M+W Group primarily focuses on leading companies in the fields of 
electronics, photovoltaics, life science, chemicals, energy, automotive, security and 
communication, as well as research institutes and universities. M+W Group is the holding 
company with headquarters in Stuttgart, Germany. In 2011 the company generated an order 
intake of $3.6 billion and revenues of $3.5 billion with more than 7,000 employees. In 2012 
M+W Group celebrated its 100th anniversary.
 
M+W Group is owned by the Austrian Stumpf Group that is globally successful in the areas of 
High-Tech Engineering, Smart & Renewable Energy, Real Estate and Technology 
Investments.
 
About LifeTek (www.lifetek.com): LifeTek is a design and consulting team who work to help 
BioPharm companies succeed in developing processes, build manufacturing capacity as well 
as establish & maintain compliance. LIFETEK focuses exclusively on pharmaceutical and 
biological projects with a strong understanding that the design of a pharmbio project begins 
with the process, whether it is a laboratory, pilot plant, or full scale manufacturing 
facility. LifeTek’s philosophy is to provide a unique solution to the needs of its client base by 
providing standard and validateable process designs and process systems to improve 
delivery, reduce cost and assure successful startup while minimizing risk.
About SmartFit Modular (www.smartFit.com): SmartFit Modular offers complete 
bioprocessing and aseptic filling suites which can be erected within an existing building, 
anywhere in the world. SmartFit suites can accommodate projects from development through 
market launch. The affordable solution can speed the rate of return on the investment.
 
Source: M+W Group

Related Stories

| Apr 13, 2011

Virginia hospital’s prescription for green construction: LEED Gold

Rockingham Memorial Hospital in Harrisonburg, Va., is the commonwealth’s first inpatient healthcare facility to earn LEED Gold. The 630,000-sf facility was designed by Earl Swensson Associates, with commissioning consultant SSRCx, both of Nashville.

| Apr 13, 2011

Office interaction was the critical element to Boston buildout

Margulies Perruzzi Architects, Boston, designed the new 11,460-sf offices for consultant Interaction Associates and its nonprofit sister organization, The Interaction Institute for Social Change, inside an old warehouse near Boston’s Seaport Center.

| Apr 13, 2011

Expanded Museum of the Moving Image provides a treat for the eyes

The expansion and renovation of the Museum of the Moving Image in the Astoria section of Queens, N.Y., involved a complete redesign of its first floor and the construction of a three-story 47,000-sf addition.

| Apr 13, 2011

Duke University parking garage driven to LEED certification

People parking their cars inside the new Research Drive garage at Duke University are making history—they’re utilizing the country’s first freestanding LEED-certified parking structure.

| Apr 13, 2011

Red Bull Canada HQ a mix of fluid spaces and high-energy design

The Toronto architecture firm Johnson Chou likes to put a twist on its pared-down interiors, and its work on the headquarters for Red Bull Canada is no exception. The energy drink maker occupies 12,300 sf on the top two floors of a three-story industrial building in Toronto, and the design strategy for its space called for leaving the base building virtually untouched while attention was turned to the interior architecture.

| Apr 13, 2011

Former department store gets new lease on life as MaineHealth HQ

The long-vacant Sears Roebuck building in Portland, Maine, was redeveloped into the corporate headquarters for MaineHealth. Consigli Construction and local firm Harriman Architects + Engineers handled the 14-month fast-track project, transforming the 89,000-sf, four-story facility for just $100/sf.

| Apr 12, 2011

Rutgers students offered choice of food and dining facilities

The Livingston Dining Commons at Rutgers University’s Livingston Campus in New Brunswick, N.J., was designed by Biber Partnership, Summit, N.J., to offer three different dining rooms that connect to a central servery.

| Apr 12, 2011

Retail complex enjoys prime Abu Dhabi location

The Galleria at Sowwah Square in Abu Dhabi will be built in a prime location within Sowwah Island that also includes a five-star Four Seasons Hotel, the healthcare facility Cleveland Clinic Abu Dhabi, and nearly two million sf of Class A office space.

| Apr 12, 2011

Luxury New York high rise adjacent to the High Line

Located adjacent to New York City’s High Line Park, 500 West 23rd Street will offer 111 luxury rental apartments when it opens later this year.

| Apr 12, 2011

College of New Jersey facility will teach teachers how to teach

The College of New Jersey broke ground on its 79,000-sf School of Education building in Ewing, N.J.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021