flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

MVRDV designs a ‘disco ball’ for Rotterdam

Museums

MVRDV designs a ‘disco ball’ for Rotterdam

The reflective façade will help the building to blend in with its verdant surroundings.


By Adilla Menayang, Assistant Digital Editor | November 11, 2015
MVRDV designs a ‘Disco Ball’ for Rotterdam

Inside the Collectiegebouw, visitors will be able to witness the backstage activity that happens at museums: restoration, transport, and storage of art. Renderings courtesy of MVRDV

Dutch firm MVRDV unveiled a new project to add to what Fast Company calls its “unorthodox architecture portfolio”—an arts building in Rotterdam that resembles a disco ball cut in half.

Called the Collectiegebouw (Dutch for "collection building"), the building “will make public the city’s extensive art collection, and give visitors a look at how museums work backstage,” Fast Company reports. It is proposed to be part of the Museum Boijmans van Beuningen in Rotterdam’s Museumpark.

The building’s reflective façade will help it blend with its park surroundings by reflecting greenery. In total, the project is 14,000 sm (or 150,694 sf), and includes a public sculpture park on its outdoor grounds.

Inside, visitors will be able to witness the backstage activity that happens at museums: restoration, transport, and storage of art.

"It is fantastic that the public art depot will be realized," Winy Maas, Principal Architect and Co-founder of MVRDV, told Fast Company. "In this way the entire population can share something that is normally hidden behind closed doors."

 

Related Stories

Museums | Aug 24, 2021

MAD Architects unveils design for Hainan Science and Technology Museum

The project is slated to break ground in late August.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Museums | Aug 17, 2021

The Rubin Museum of Art’s Mandala Lab set to open

The new space occupies the museum’s third floor.

Museums | Jul 20, 2021

ANOHA — The Children’s World of the Jewish Museum Berlin opens

Olson Kundig designed the project.

Museums | Jul 12, 2021

The world’s largest astronomy museum completes in Shanghai

Ennead Architects designed the project.

Museums | Jul 1, 2021

New-York Historical Society Museum & Library expands Central Park West location

Robert A.M. Stern Architects designed the project.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Museums | Jun 22, 2021

Cleveland’s Natural History museum to break ground on new Exhibit Hall

The added space will organize its artifacts and specimens to show humanity’s connection to science, the planet, and the universe.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021