Plans for a new hotel in the Persian Gulf are taking Dubai’s Palm Islands concept to a whole new level—underwater, that is.
Amphibious 1000, designed by Giancarlo Zema Design Group, is a design for a semi-submerged hotel resort off Qatar’s coast that closely resembles the iconic man-made islands in Dubai, Architizer reports.
The designers told Architizer the hotel is comparable to “a big aquatic animal stretching out from the land into the sea.” Residential buildings will be built on the land portion, together with office buildings and a marina.
The sea section will have four semi-submerged hotels offering sea views. There will be 73 luxury suites arranged around the permeter of the building, each with a large terrace. The complex of semi-submerged units will be surrounded by aquariums.
A welcome center will be connected to an underwater observatory in the center with a glass tunnel.
Visit Architizer for the full story.
Related Stories
| Sep 28, 2011
Look who's coming to BD+C's Under-40 Leadership Summit
AEC industry "under-40 superstars" from top design and construction firms have signed up for BD+C's "Under-40 Leadership Summit."
| Sep 28, 2011
GBCI announces LEED fellow class of 2011
LEED Fellows represent green building industry's most accomplished professionals.
| Sep 28, 2011
Bradley sponsors design studio on intelligent buildings for UWM SARUP
The studio is taught by Gregory D. Thomson, assistant professor and co-director of the Institute for Ecological Design at UWM.
| Sep 23, 2011
Fire and hurricane rated glazed wall assemblies installed at multi-family residence in Florida
Fire and hurricane assemblies meet design and code requirements.
| Sep 23, 2011
ABI turns positive after four monthly declines
On the heels of a period of weakness in design activity, the Architecture Billings Index (ABI) took a sudden upturn in August.
| Sep 23, 2011
Under 40 Leadership Summit
Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.