flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Must see for the holidays: Architects re-create iconic structures using gingerbread

Must see for the holidays: Architects re-create iconic structures using gingerbread

Gensler, PBK, Page Sutherland Page, and Kirksey were among the firms to compete in the 5th Annual Gingerbread Build-Off.


By BD+C Staff | December 20, 2013

AIA Houston and Architecture Center Houston last week partnered to host the 5th Annual Gingerbread Build-Off. The event pitted 32 architecture teams against one another to see who could design and build the most unique and creative structures using gingerbread. 

Gensler, PBK, Page Sutherland Page (now dba Page), Seeberger Architecture, and Kirksey were among the major firms to participate. Students and design enthusiasts also competed in the event, which drew more than 2,000 spectators. 

The team from Kirksey took the top prize with its gingerbread interpretation of the London Tower Bridge. In all, nine teams were honored:

 

Grand Prix de Show: 
Kirksey
London Tower Bridge 

 

 

1st Runner up:
Art Institute of Houston
Falling Water 

 

 

2nd Runner Up:
Gensler
Hogwarts Castle 

 

 

Public Favorite:
Seeberger Architecture
Despicable Me

 

 

Best Traditional: 
PDR
The Classic 

 

 

Best Non-Traditional:
Eggersmann
Kitchen

 

 

Best Architecture Icon:
PDR
Jingle Bell Demo - Foley's 

 

 

Most Creative Use of Materials:
Page Sutherland Page Gingertects
Blizzard of Oz

 

 

Tallest Standing Structure:
PBK
Kung Fu Candy Crushers (50")

 

    

Related Stories

| Mar 2, 2012

By the Numbers

66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs. 

| Mar 1, 2012

Intelligent construction photography, not just pretty pictures

Our expert tells how to organize construction progress photos so you don’t lose track of all the valuable information they contain.

| Mar 1, 2012

AIA: A clear difference, new developments in load-bearing glass

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Mar 1, 2012

8 tips for architects to consider before LED installation

Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.

| Mar 1, 2012

Reconstruction Awards: Reinvesting in a neighborhood’s future

The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.

| Mar 1, 2012

7 keys to ‘Highest value, lowest cost’ for healthcare construction

The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.

| Mar 1, 2012

Cornell shortlists six architectural firms for first building on tech campus

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.

| Mar 1, 2012

Aragon Construction completes 67,000-sf build-out in NYC

Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021