flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Must see for the holidays: Architects re-create iconic structures using gingerbread

Must see for the holidays: Architects re-create iconic structures using gingerbread

Gensler, PBK, Page Sutherland Page, and Kirksey were among the firms to compete in the 5th Annual Gingerbread Build-Off.


By BD+C Staff | December 20, 2013

AIA Houston and Architecture Center Houston last week partnered to host the 5th Annual Gingerbread Build-Off. The event pitted 32 architecture teams against one another to see who could design and build the most unique and creative structures using gingerbread. 

Gensler, PBK, Page Sutherland Page (now dba Page), Seeberger Architecture, and Kirksey were among the major firms to participate. Students and design enthusiasts also competed in the event, which drew more than 2,000 spectators. 

The team from Kirksey took the top prize with its gingerbread interpretation of the London Tower Bridge. In all, nine teams were honored:

 

Grand Prix de Show: 
Kirksey
London Tower Bridge 

 

 

1st Runner up:
Art Institute of Houston
Falling Water 

 

 

2nd Runner Up:
Gensler
Hogwarts Castle 

 

 

Public Favorite:
Seeberger Architecture
Despicable Me

 

 

Best Traditional: 
PDR
The Classic 

 

 

Best Non-Traditional:
Eggersmann
Kitchen

 

 

Best Architecture Icon:
PDR
Jingle Bell Demo - Foley's 

 

 

Most Creative Use of Materials:
Page Sutherland Page Gingertects
Blizzard of Oz

 

 

Tallest Standing Structure:
PBK
Kung Fu Candy Crushers (50")

 

    

Related Stories

| Jul 18, 2012

Legat & Kingscott relocates architecture/interior design office

Move enables the architecture/interior design firm to better serve its expanding clientele.

| Jul 18, 2012

Alcoa appoints Hunter Architectural Manager

Hunter to operate with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.

| Jul 17, 2012

AIA and Architecture for Humanity select Disaster Response Grant recipients

Awards help each group implement their locally driven preparedness project in the second half of the year.  

| Jul 17, 2012

KM/Plaza changes name to Plaza Construction

Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.

| Jul 17, 2012

Dr. Phillips Charities Headquarters Building receives LEED Silver

The building incorporates sustainable design features, environmentally-friendly building products, energy efficient systems, and environmentally sensitive construction practices.

| Jul 16, 2012

BD+C Under 40 Leadership Summit scheduled

Attendee registration for U40 Summit II now open.

| Jul 16, 2012

Construction spending at 2 ½ year peak

Construction economist Ken Simonson says that four private nonresidential categories each posted 12-month spending increases of more than 25%: power and energy construction, 35%; hotels, 29%; educational and manufacturing, 27% apiece.

| Jul 16, 2012

Chen named design director at Heery

Chen comes to Heery from his own firm, Mark Chen Architect, a design and planning consulting firm, based in New York City, whose recent work includes large-scale planning studies for mixed-use projects.

| Jul 16, 2012

Reed Construction hires new project manager

Fread is a LEED AP and received his degree from Purdue University.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

boombox1
boombox2
native1

More In Category


Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.



Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021