flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multifamily building in downtown Montreal is being built from the roof down

Multifamily Housing

Multifamily building in downtown Montreal is being built from the roof down

The method eliminates the need for scaffolding and cranes.


By Adilla Menayang, Assistant Digital Editor | October 27, 2015
Multifamily building in downtown Montreal is being built from the roof down

According to Upbrealla Construction President Joël Larouche, the approach is the future for projects on small lots.

How can you eliminate the need for cranes and closing off sidewalks during construction in a small, urban lot? By building from the roof down, CBC News reports.

The method, which also eliminates the need for scaffolding, was developed by 3L Innogenie, and is being used on the construction of a 10-story residential development called Rubic in downtown Montreal.

"This approach is the future for small lots where there is no place to work," Joël Larouche, President of Upbrella Construction, told CBC News.

 

 

Developer Luc Poirier, who is behind the Rubic project, says that the method allows developers to adjust the height of their project during construction.

"When the economic market is so-so, banks will invest because we can start with a 40-floor project and when the market drops off, you can stop at the 20th and sell or rent it out," he told CBC News.

The building is projected to be finished by July 1st, 2016. 

 


Rendering courtesy of Rubic

Related Stories

Multifamily Housing | Dec 4, 2019

9 tips on creating places of respite and reflection

We talked to six veteran landscape architects about how to incorporate gardens and quiet spaces into multifamily communities.

| Nov 20, 2019

ClosetMaid to celebrate 55 years in business at the 2020 NAHB International Builders Show

Company to celebrate 55 years in storage and organization with a visit by celebrity guest Anthony Carrino.

Multifamily Housing | Nov 14, 2019

U.S. multifamily market stays strong into 4th quarter 2019

October performance sets a record amid rising political pressure to cap rent growth, reports Yardi Matrix. 

Multifamily Housing | Nov 7, 2019

Multifamily construction market remains strong heading into 2020

Fewer than one in 10 AEC firms doing multifamily work reported a decrease in proposal activity in Q3 2019, according to a PSMJ report.

| Nov 6, 2019

Solomon Cordwell Buenz opens Seattle office, headed by Nolan Sit

National design firm brings residential high-rise expertise to the Pacific Northwest

| Nov 6, 2019

Passive House senior high-rise uses structural thermal breaks to insulate steel penetrations

Built to International Passive House standards, the Corona Senior Residence in Queens, N.Y., prevents thermal bridging between interior and exterior steel structures by insulating canopies and rooftop supports where they penetrate the building envelope.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021