flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multifamily building with 25,000 sf of amenities rises on the shore of the Potomac River

Multifamily Housing

Multifamily building with 25,000 sf of amenities rises on the shore of the Potomac River

The building is part of the National Gateway mixed-use development at Potomac yard.


By David Malone, Associate Editor | February 22, 2018
The Sur multifamily development
The Sur multifamily development

The National Gateway mixed-use development at Potomac Yard, the 295-acre site of a former railroad switch yard, is about to receive a new 12-story, 360-unit residential building. Dubbed The Sur, the new building will occupy a 1.67-acre site at 3400 Potomac Avenue.

The design for The Sur was inspired by Big Sur, a rugged stretch of California’s central coast. The Sur will meld sustainable and rustic features with more modern elements. Units will feature high-end finishes and range in size from 557-sf studios to 1,419-sf three-bedroom units.

Additionally, The Sur will comprise 16,500 sf of retail space and 25,000 sf of amenities. Amenities include:

 

— Outdoor landscaped oasis meant to mimic the feel of a national park with large boulders, moss, forest trees, a fire pit, and seating areas.

— An eighth floor Party Room with a fireplace, bar, and a large table, all of which is connected to a spacious outdoor terrace with Potomac River and National Monument views.

— Rooftop spa oasis with cabanas, natural landscaping, and a water element that surround seating areas and fire pits.

— Fitness center and adjacent outdoor lawn for Yoga and an area to gather for movie nights.

— Floating fire place and lounge with “worm hole” seating in the south lobby

— Dog spa and wash area

— Conference room/business center enclosed in a wood and glass structure in the north lobby

 

The Sur sits on the shore of the Potomac River and is just minutes from Reagan National Airport. Erkiletian is the project’s developer and Carlyn and Company Interiors + Design is leading the interior architecture and design development of the 25,000 sf of amenities. The building is slated for completion in April 2020.

Related Stories

Multifamily Housing | Nov 5, 2019

The Collective Paper Factory is the co-living company’s first U.S. location

The building offers a stay model ranging from one night to 29 days.

Multifamily Housing | Nov 4, 2019

A historic ice cream factory now provides Milwaukee with affordable housing

Thanks to projects like this, the Lindsay Heights neighborhood is definitely on the upswing.

Multifamily Housing | Oct 31, 2019

Soltra at SanTan Village breaks ground in Arizona

Todd & Associates designed the project.

| Oct 30, 2019

James McHugh Construction breaks ground on 1000M, Michigan Avenue’s tallest tower to be

McHugh will start work on the 832-foot-tall residential 1000M tower in December 2019.

| Oct 30, 2019

The Beach Company acquires land for multifamily community in Chattanooga

River Rock project will add 163 apartments near the Tennessee River in Chattanooga’s downtown riverfront district.

Multifamily Housing | Oct 30, 2019

Techno-magnet: Multifamily development attracts top tech workers, students

Proto Kendall Square is wooing grad students and millennial STEM workers from what’s arguably ‘the most innovative square mile on the planet.’

Multifamily Housing | Oct 24, 2019

Webster Green brings affordable and supportive housing to the Bronx

Magnusson Architecture and Planning designed the building.

| Oct 22, 2019

Ben Seager, AIA, Named KTGY’s New 75+ Service-Enriched National Practice Area Leader

Ben Seager, AIA, Named KTGY’s New 75+ Service-Enriched National Practice Area Leader

Multifamily Housing | Oct 17, 2019

Development enlivens a city on Texas’ Gulf Coast

Three mixed-use communities in Port Aransas are expanding.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021