flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multifamily building with 25,000 sf of amenities rises on the shore of the Potomac River

Multifamily Housing

Multifamily building with 25,000 sf of amenities rises on the shore of the Potomac River

The building is part of the National Gateway mixed-use development at Potomac yard.


By David Malone, Associate Editor | February 22, 2018
The Sur multifamily development
The Sur multifamily development

The National Gateway mixed-use development at Potomac Yard, the 295-acre site of a former railroad switch yard, is about to receive a new 12-story, 360-unit residential building. Dubbed The Sur, the new building will occupy a 1.67-acre site at 3400 Potomac Avenue.

The design for The Sur was inspired by Big Sur, a rugged stretch of California’s central coast. The Sur will meld sustainable and rustic features with more modern elements. Units will feature high-end finishes and range in size from 557-sf studios to 1,419-sf three-bedroom units.

Additionally, The Sur will comprise 16,500 sf of retail space and 25,000 sf of amenities. Amenities include:

 

— Outdoor landscaped oasis meant to mimic the feel of a national park with large boulders, moss, forest trees, a fire pit, and seating areas.

— An eighth floor Party Room with a fireplace, bar, and a large table, all of which is connected to a spacious outdoor terrace with Potomac River and National Monument views.

— Rooftop spa oasis with cabanas, natural landscaping, and a water element that surround seating areas and fire pits.

— Fitness center and adjacent outdoor lawn for Yoga and an area to gather for movie nights.

— Floating fire place and lounge with “worm hole” seating in the south lobby

— Dog spa and wash area

— Conference room/business center enclosed in a wood and glass structure in the north lobby

 

The Sur sits on the shore of the Potomac River and is just minutes from Reagan National Airport. Erkiletian is the project’s developer and Carlyn and Company Interiors + Design is leading the interior architecture and design development of the 25,000 sf of amenities. The building is slated for completion in April 2020.

Related Stories

Multifamily Housing | Aug 24, 2020

Portland’s zoning reform looks to boost the ‘missing middle’ of housing

The city council in Portland, Ore., recently approved the “Residential Infill Project” (RIP), a package of amendments to the city’s zoning code that legalizes up to four homes on nearly any residential lot and sharply limits building sizes.

Multifamily Housing | Aug 24, 2020

Texaco’s century-old headquarters is now a luxury apartment community

After sitting vacant for nearly three decades, the former home of Texaco, Inc. has been converted into a 17-story, 286-unit apartment building in the heart of downtown Houston.

Multifamily Housing | Aug 23, 2020

Designing affordable housing on odd urban lots in LA

"Misfit parcels" could be the key to providing more affordable housing in Los Angeles, say two experienced multifamily housing designers.

Multifamily Housing | Aug 16, 2020

TCA Architects specifies Engineered Floors products for 304-unit apartment complex in Tracy, Calif.

TCA Architects specified Lewis Rigid Stone Polymer floating plank and Lewis Gold 100% Solution-Dyed high-performance fiber carpet for Harvest in Tracy, Calif.

Multifamily Housing | Aug 3, 2020

71-unit 100% affordable housing development breaks ground in Mountain View, Calif.

Van Meter Williams Pollack is designing the project.

Multifamily Housing | Aug 2, 2020

Stantec-designed 17 West mixed-use development completed in Miami Beach

Stantec-designed 17 West mixed-use development completed, with first Trader Joe's in Miami Beach.

Multifamily Housing | Jul 31, 2020

Railings manufacturer VistaPro launches its new website

VistaPro Architectural Railing Solutions launches new website.

Multifamily Housing | Jul 29, 2020

Multifamily construction proposal activity sees modest rebound in Q2 2020

Among the firms that work in the multifamily sector, 31% said that proposal activity increased in the second quarter, while 24% said it decreased.

Multifamily Housing | Jul 29, 2020

San Francisco’s Millennium Tower fix approved, moving forward

Simpson Gumpertz & Heger will be the engineer-of-record for the fix.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021