flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multifamily 2018 outlook: Developers tap the brakes, but will maintain historic pace

Multifamily Housing

Multifamily 2018 outlook: Developers tap the brakes, but will maintain historic pace

Multifamily developers are poised to register the second-highest annual completions count of this cycle in 2018, but with fewer completions than 2017’s cycle peak, according to a CBRE report.


By CBRE | January 10, 2018
Multifamily 2018 outlook: Developers pump the brakes, but will maintain historic pace

Photo: Pixabay

Development will play a key role in the U.S. multifamily market in 2018. Developers are poised to register the second-highest annual completions count of this cycle, with as many as 258,000 units delivered. This is based on 62 markets tracked by CBRE Econometric Advisors.

This would be down by 9.2% from 2017’s cycle peak, projected at 284,000. Apartment starts began to slow in 2017, so the multifamily market will get a reprieve from new supply by late 2018 and throughout 2019.

Starts will continue to slow in 2018, as banks have scaled back development lending over the past two years. While other sources of development capital have emerged (e.g., debt funds) or reemerged (e.g., HUD financing), the climate for financing new development should remain more conservative, and debt capital costs more expensive. 

For more, download CBRE’s free 2018 Multifamily Outlook report (registration required).

 

As of December 2017, nearly 23% of all units under construction in U.S. markets are in urban cores. In the long term, urban core multifamily will perform well, but for the short term, market statistics indicate that the best development opportunities are in the suburbs.

 

Suburban markets have seen the highest rent growth rate over the past two years. 

 
 

Related Stories

Modular Building | Jan 26, 2021

Offsite manufacturing startup iBUILT positions itself to reduce commercial developers’ risks

iBUILT plans to double its production capacity this year, and usher in more technology and automation to the delivery process.

Multifamily Housing | Jan 26, 2021

Merriman Anderson/Architects designs affordable housing complex out of shipping containers

The architect partnered with CitySquare Housing on the project.

Multifamily Housing | Jan 20, 2021

Abandoned Miami hospital gets third life as waterfront condo development

The 1920s King Cole Hotel becomes the Ritz-Carlton Residences Miami in the largest residential adaptive reuse project in South Florida.

Multifamily Housing | Jan 19, 2021

$100 million affordable housing development under construction in Santa Clara

KTGY Architecture + Planning is designing the project.

Multifamily Housing | Jan 14, 2021

The Weekly show, Jan 14, 2021: Passive House innovations, and launching a design studio during the pandemic

This week on The Weekly show, BD+C editors speak with AEC industry leaders about innovations in Passive House design, and the challenges of building a design team and opening a new design studio during a pandemic.

Multifamily Housing | Jan 11, 2021

McHugh Construction completes 5th-tallest all-residential building in the U.S.

McHugh Construction Completes Two Chicago Apartment Projects for Fifield Cos. and Crescent Heights, Including NEMA Chicago –Tallest All-Residential Building in Chicago and 5th Tallest in North Americ

Multifamily Housing | Jan 8, 2021

Student housing development in the time of COVID-19

Despite the coronavirus pandemic, many college and university residences were completed in time for classes, live or virtual. Here are 14 of the best.

Market Data | Dec 29, 2020

Multifamily transactions drop sharply in 2020, according to special report from Yardi Matrix

Sales completions at end of Q3 were down over 41 percent from the same period a year ago.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021