flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multi-level design elevates Bulgarian Children's Museum [slideshow]

Multi-level design elevates Bulgarian Children's Museum [slideshow]

Embodying the theme “little mountains,” the 35,000-sf museum will be located in a former college laboratory building in the Studenski-grad university precinct.


By BD+C Staff | April 18, 2014
Embodying the theme little mountains, the 35,000-sf museum will be located in
Embodying the theme little mountains, the 35,000-sf museum will be located in a former college laboratory building in the Stud

New York-based Lee H. Skolnick Architecture + Design Partnership has been selected to design a new children’s museum in Sofia, Bulgaria—the first children’s museum in Eastern Europe.

The museum, called MUZEIKO, will be located in a former college laboratory building in the Studentski-grad university precinct. A+A Architects will assist in the project, which is being planned by the America for Bulgaria Foundation. 

Embodying the theme “little mountains,” the 35,000-sf museum will include interpretive exhibits, a café, and an outdoor green roof, amphitheater, and science-themed play area. Inside, each of the building’s three levels will explore a different era in Bulgaria—past, present, and future. 

Paul Orselli Workshop (POW!) is consulting on the project and will help develop complementary STEAM (science, technology, engineering, arts, and math) educational programs.

 

Related Stories

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 22, 2011

Corporate America adopting revolutionary technology

The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector. 

| Nov 22, 2011

Report finds that L.A. lags on solar energy, offers policy solutions

Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

| Nov 22, 2011

New Green Matters Conference examines emerging issues in concrete and sustainability

High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021