flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Moshe Safdie: Skyscrapers lead to erosion of urban connectivity

Moshe Safdie: Skyscrapers lead to erosion of urban connectivity

The 76-year-old architect sees skyscrapers and the privatization of public space to be the most problematic parts of modern city design. 


By BD+C Staff | October 6, 2014
Photo: Norma Gmez via Wikimedia Commons
Photo: Norma Gmez via Wikimedia Commons

During the World Architecture Festival’s closing keynote speech, Canadian-Israeli architect Moshe Safdie criticized today’s urban planning and invited attendees and the larger community to “reflect that our planning tools are no longer adequate, that the way we have planned in the past is no longer effective,” Dezeen reported.

The festival took place in Singapore's Marina Bay Sands, which Safdie designed.

“The profession needs reorientation. I also think that our understanding of what urban design is all about [needs] reorientation,” Safdie added.

The 76-year-old sees skyscrapers and the privatization of public space to be the most problematic parts of modern city design. This privatization of the public realm leads to an erosion of urban connectivity, Dezeen wrote. 

“The new typology is the superblock: a cluster of high-rise buildings of mixed use, sitting on a podium which is a retail mall. That’s the dominant typology of the mixed-use downtown area across Asia, across Latin America and emerging now in every part of the world.”

Dezeen has the full story.

Related Stories

| Jul 19, 2012

The best states for a construction job

The top anticipated engineering and skilled labor shortages according to a survey of 2,223 construction industry professionals.

| Jul 19, 2012

Suffolk Construction launches subcontractor development series

Professional certificate program to provide core construction management skills to disadvantaged, minority, and women business enterprises.

| Jul 19, 2012

Construction begins on military centers to treat TBI and PTS

First two of several centers to be built in Fort Belvoir, Va. and Camp Lejeune, N.C.

| Jul 18, 2012

U.S. engineering firms set sail for foreign ports

Other E/EA Giants 300 firms are just dipping their toes into foreign waters, still looking for international business but choosing not to establish additional offices.

| Jul 18, 2012

Architecture giants spreading their wings

A/AE Giants 300 rankings reveal firms branching out globally, merging, adding services.

| Jul 18, 2012

Green expert Kats joins GreenWizard as an advisor

Kats' role is to help further expand GreenWizard’s impact in the sustainable construction industry.

| Jul 18, 2012

Construction employment stagnates in June

Lack of hiring in construction combined with job growth elsewhere threatens to create skilled-labor gap once contractors are ready to hire again.

| Jul 18, 2012

Legat & Kingscott relocates architecture/interior design office

Move enables the architecture/interior design firm to better serve its expanding clientele.

| Jul 18, 2012

Alcoa appoints Hunter Architectural Manager

Hunter to operate with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.

| Jul 17, 2012

AIA and Architecture for Humanity select Disaster Response Grant recipients

Awards help each group implement their locally driven preparedness project in the second half of the year.  

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021