flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mortenson starts construction of Rim Rock Wind Project

Mortenson starts construction of Rim Rock Wind Project

Renewable energy contractor to build 189-megawatt wind project in Sunburst, Mont.


By By BD+C Staff | January 11, 2012
Mortenson is responsible for the design and construction of access roads, foundations, erection of 126 Acciona 1.5-megawatt turb

Mortenson Construction was selected by San Francisco-based developer, NaturEner, for the construction of the Rim Rock Wind Project. Located on nearly 21,000 acres approximately 20 miles north of NaturEner's Glacier I and 2 Wind projects, previously constructed by Mortenson, Rim Rock will generate189-megawatts of wind power -- enough energy to power approximately 66,000 homes.

Mortenson is responsible for the design and construction of access roads, foundations, erection of 126 Acciona 1.5-megawatt turbines, overhead and underground electrical collection system, (2) 230kV substations, the generator tie line, and an O&M facility. Construction began late October, proceeding through the winter months and is expected to be complete in October, 2012.

Montana's wind attributes are unique to the industry. According to AWEA, the state is ranked third in the U.S. for potential wind generating capacity, with more than 944,000 megawatts available for production. This much wind energy could produce more than 210 times the state's current electricity needs. Along with Montana's vast wind resources, the siting for this project was selected because of the ease of access to the property and the business-friendly development atmosphere in this part of Montana. BD+C

Related Stories

| May 31, 2012

AIA Course: High-Efficiency Plumbing Systems for Commercial and Institutional Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 31, 2012

2011 Reconstruction Awards Profile: Ka Makani Community Center

An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.

| May 31, 2012

5 military construction trends

Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.

| May 31, 2012

New School’s University Center in NYC topped out

16-story will provide new focal point for campus.

| May 31, 2012

Day & Zimmermann taps Jobe for ECM VP

Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.

| May 31, 2012

Perkins+Will-designed engineering building at University of Buffalo opens

Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.

| May 30, 2012

Construction milestone reached for $1B expansion of San Diego International Airport

Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.

| May 30, 2012

Pringle Brandon in discussions to join forces with Perkins+Will

The London offices would be known as Pringle Brandon Perkins+Will.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021