Mortenson Construction has completed construction of the Elk Wind Project located in Greeley, Iowa. Owned by RPM Access, an independent developer, owner and operator of wind farms in the Midwest, the project will add 41 megawatts to the state's 3600-plus megawatts of wind energy currently online.
Mortenson was responsible for the design and construction of access roads, foundations, underground collection and a 69-kV substation.
"We were delighted to partner with RPM on our first project together," said Tim Maag, a vice president and general manager of Mortenson's Renewable Energy groups. "We share their commitment to expanding wind energy throughout the Midwest--and especially Iowa as one of the leading states in wind energy."
Mortenson will complete construction of five wind projects In Iowa this year. By the end of 2011, Mortenson will have built 17 wind projects in the state generating a total of 1894 megawatts of renewable power. BD+C
Related Stories
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but thereās still plenty of project dollars out there if you know where to look.
| May 31, 2012
New Schoolās University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columnsāāeach 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of āLive.Work.Learnā student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.