Mortenson Construction has been selected as EPC contractor by San Francisco-based MP2 Capital to construct the largest photovoltaic (PV) solar array to be built in Scotland County, N.C.
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis--the equivalent of Ā electricity usage for approximately 600 homes.
As EPC contractor Mortenson will provide design and engineering services as well as install all project components, which will include Trina multicrystalline modules, Northern States Metal Solar FlexRack racking systems, and SMA inverters. Construction crews will break ground in January and expect to complete the project by the end of April 2012. BD+C
Related Stories
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.Ā
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, thereās a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big Dās billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallasās new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built bothāin the same building.
Building Team Awards | Apr 9, 2015
āPrudent, not opulentā sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Miesā Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve āMies in a contemporary Miesian way.ā
Cultural Facilities | Apr 6, 2015
Berkeleyās West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certifiedĀ building.