Mortenson Construction was recently selected by San Diego-based developer enXco for the construction of the Pacific Wind Project. Located on the south slope of the Tehachapi Mountains in Kern County California, the 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.
Mortenson is responsible for the design and construction of access roads, foundations, erection, overhead and underground electrical collection system, and a 14,400-sf O&M facility that will support the Pacific Wind Project as well as other enXco projects slated for development in the area. Construction will begin in December 2011 and is expected to be complete in August 2012.
The Pacific Wind Project is the 19th wind power facility that Mortenson has constructed in partnership with enXco. Together the partnership has provided nearly 2 GW of energy throughout the United States. In early October, Mortenson completed construction of enXco’s 205.5 megawatt Lakefield Wind Project in southern Minnesota. In Minnesota alone, the enXco - Mortenson partnership has developed and constructed approximately 36% of the state’s wind energy capacity. BD+C
Related Stories
| Mar 14, 2012
Hyatt joins Thornton Tomasetti as VP in Chicago
A forensic specialist, Hyatt has more than 10 years of experience performing investigations of structural failures throughout the U.S.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 13, 2012
China's high-speed building boom
A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.
| Mar 13, 2012
Worker office space to drop below 100-sf in five years
The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.
| Mar 12, 2012
Improving the performance of existing commercial buildings: the chemistry of sustainable construction
Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.
| Mar 9, 2012
2012 Giants 300 survey due Friday, April 13
See how your firm ranks among the AEC industry leaders.
| Mar 7, 2012
Firestone iPad app offers touch technology
Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.