Mortenson Construction was recently selected by San Diego-based developer enXco for the construction of the Pacific Wind Project. Located on the south slope of the Tehachapi Mountains in Kern County California, the 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.
Mortenson is responsible for the design and construction of access roads, foundations, erection, overhead and underground electrical collection system, and a 14,400-sf O&M facility that will support the Pacific Wind Project as well as other enXco projects slated for development in the area. Construction will begin in December 2011 and is expected to be complete in August 2012.
The Pacific Wind Project is the 19th wind power facility that Mortenson has constructed in partnership with enXco. Together the partnership has provided nearly 2 GW of energy throughout the United States. In early October, Mortenson completed construction of enXco’s 205.5 megawatt Lakefield Wind Project in southern Minnesota. In Minnesota alone, the enXco - Mortenson partnership has developed and constructed approximately 36% of the state’s wind energy capacity. BD+C
Related Stories
| Sep 6, 2012
CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building
The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.
| Sep 5, 2012
Pagano joins Thornton Tomasetti as Vice President in Newark office
Pagano is a Certified Energy Planner and Certified Energy Manager through the Association of Energy Engineers.
| Aug 30, 2012
John S Clark Co. completes teaching lab at UNC Wilmington
Three-story building provides offices, classrooms, and labs.
| Aug 29, 2012
BOND completes South Cove Community Health Center
$11 million, 21,000 square foot community health center opens in Quincy, Mass.
| Aug 29, 2012
Mamayek joins HDR as Design Principal in Boston
He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.
| Aug 28, 2012
McCarthy begins construction on transportation center at Bob Hope Airport
Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.
| Aug 28, 2012
Wisnewski Blair & Associates changes name to HGA Mid-Atlantic
New name reflects firm's growing design resources on East Coast.
| Aug 24, 2012
Meis heads to Woods Bagot Sport
Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.
| Aug 21, 2012
Under 40 Leadership Summit slated for October 3-5 in Chicago
Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.