South Florida-based real estate development firm Newgard Development Group selected John Moriarty & Associates of Florida (JMAF) as general contractor for BrickellHouse, a 374-unit condominium tower in the heart of Miami’s Brickell neighborhood. Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.
BrickellHouse will offer condos ranging in size from studios and 1-, 2-, 3-bedroom units, to 7,000 sf penthouses. The $170 million development will include amenities including the Brickell area’s first members-only rooftop sky deck and pool located on the building’s 46th floor, a high-definition screening room, spa and fitness center, and wireless internet in all common areas. Residences will feature private balconies with expansive water views of Biscayne Bay and Downtown Miami, gourmet kitchens, bathrooms with imported European cabinetry, and premium appliances and finishes. It will also be home to one of the nation’s first fully-automated robotic parking garages, which will yield significant convenience and security, as well as environmental benefits. BD+C
Related Stories
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.