South Florida-based real estate development firm Newgard Development Group selected John Moriarty & Associates of Florida (JMAF) as general contractor for BrickellHouse, a 374-unit condominium tower in the heart of Miami’s Brickell neighborhood. Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.
BrickellHouse will offer condos ranging in size from studios and 1-, 2-, 3-bedroom units, to 7,000 sf penthouses. The $170 million development will include amenities including the Brickell area’s first members-only rooftop sky deck and pool located on the building’s 46th floor, a high-definition screening room, spa and fitness center, and wireless internet in all common areas. Residences will feature private balconies with expansive water views of Biscayne Bay and Downtown Miami, gourmet kitchens, bathrooms with imported European cabinetry, and premium appliances and finishes. It will also be home to one of the nation’s first fully-automated robotic parking garages, which will yield significant convenience and security, as well as environmental benefits. BD+C
Related Stories
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.