flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

More recession-postponed design projects are being resurrected, says AIA

More recession-postponed design projects are being resurrected, says AIA

Mixed-use projects were the most likely to receive new life. 


By John Caulfield, Senior Editor | October 9, 2014
Photo: Tangopaso via Wikimedia Commons
Photo: Tangopaso via Wikimedia Commons

Architectural firms are steadily reviving projects that were put on hold during the last economic downturn.

About three quarters of the estimated 700 firms that serve as panelists on AIA’s Architectural Billings Index (ABI) had delayed or canceled major design projects in response to recessionary pressures. Nearly one-third of those firms now say they have since restarted stalled projects. 

Mixed-use projects were the most likely to receive new life. But only 26% of the panelists surveyed say they’ve restarted residential projects.

AIA says that the loosening of construction credit and a general improvement in the industry’s outlook on the economy continue to drive billings and construction spending. The ABI in August stood at 53.0, lower than the 53.6 score of August 2013 or the 55.8 in July 2014. AIA notes, however, that any ABI score above 50 indicates growth.

August billings were stronger than the national index in the Northeast and South, and for multifamily residential and mixed-practice projects. 

Related Stories

| Apr 10, 2013

6 funding sources for charter school construction

Competition for grants, loans, and bond financing among charter schools is heating up, so make your clients aware of these potential sources.

| Apr 10, 2013

23 things you need to know about charter schools

Charter schools are growing like Topsy. But don’t jump on board unless you know what you’re getting into.

| Apr 9, 2013

FMI predicts 8% rise in construction put in place for 2013

FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels. 

| Apr 8, 2013

Most daylight harvesting schemes fall short of performance goals, says study

Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021