Availability of manufactured mass timber elements that can be used in high-rise construction projects is increasing in the U.S.
The latest line of timber beams and columns was recently announced by Freres Lumber Co., Inc. of Lyons, Ore. The APA-certified products currently run up to 12 inches in length with a depth of 72 inches, but, the company says, could be produced up to 24 inches thick.
The product line is capable of being produced up to 60 feet in length, but Freres’ current press is limited to 48 feet. The company will seek certification for products in larger widths and depths in the coming months.
Freres’s Mass Plywood Panel (MPP) manufacturing process is patented, producing engineered wood products that use 20%-30% less wood than other mass timber products, according to a Freres’ news release.
Related Stories
Codes and Standards | May 11, 2016
Current California seismic codes provide safety, resiliency, but needed upgrades present challenge
Los Angeles requires seismic retrofits, but other cities do not.
Codes and Standards | May 10, 2016
Apple spars with Cupertino, Calif., mayor over strained city infrastructure
Apple’s new ‘spaceship’ campus project prompts questions about whether the company should pay more to offset traffic woes.
Codes and Standards | May 9, 2016
Safety Stand-Down yields proposals to boost construction safety
One example: Gilbane encourages safety harnesses for all working above 6 feet.
Codes and Standards | May 9, 2016
EcoDistricts unveils sustainable neighborhood framework
Focus is on equity, resilience, and climate protection.
School Construction | May 3, 2016
Florida clamps down on school construction spending
Critics fear rules will hamper ability to build schools with desired features.
Resiliency | May 2, 2016
Connecticut to develop new code standards for resiliency
Expected more frequent severe weather events due to climate change prompts review.
Contractors | Apr 29, 2016
OSHA issues advisory to protect workers from Zika virus
Construction industry workers considered at high risk.
Codes and Standards | Apr 28, 2016
New research finds 30 measures to significantly cut energy use
ASHRAE’s prescription cuts across all building types and climates.
Codes and Standards | Apr 27, 2016
Florida gives developers more time to install first responder radio signal systems
Expensive upgrades can be postponed for several years.
Codes and Standards | Apr 25, 2016
San Francisco becomes first big U.S. city to require solar panels on new buildings
Pertains to commercial and residential buildings shorter than 10 stories.