flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

More than half of Houston properties at high or moderate risk of flooding are not in FEMA flood zone

Codes and Standards

More than half of Houston properties at high or moderate risk of flooding are not in FEMA flood zone

Properties outside of these zones are not required to carry flood insurance.


By Peter Fabris, Contributing Editor | September 7, 2017
Floodwaters rise at the Interstate Motor Lodge in Houston

Wikimedia Commons Public Domain

More than half of residential and commercial properties in Houston that are at high or moderate risk of flooding are not included in the Federal Emergency Management Agency's Special Flood Hazard Areas (SFHA), according to CoreLogic.

Properties outside those zones don't need flood insurance, so many flood victims of Hurricane Harvey will not have access to insurance reimbursements to make repairs. About 52% of residential and commercial properties in the Houston metro are at “High” or “Moderate” risk of flooding, but are not in a (SFHA), CoreLogic says.

Less than two weeks before Harvey, President Trump did away with the Obama-era Federal Flood Risk Management Standard that required federally funded construction in flood-prone areas to be built to higher resilience standards. There are concerns that rebuilding in Houston will not be done according to the more stringent standards that in some cases require structures to be built at higher elevations.

FEMA had proposed that most construction projects using federal funds be built 2 feet above the 100-year floodplain. Hospitals and other "critical action" projects would have been required to be built 3 feet above that floodplain. The higher elevation could mean the difference between full hospital functionality and a complete failure of electrical, plumbing, and mechanical systems, according to an NBBJ healthcare partner quoted in a Modern Healthcare report.

Related Stories

Codes and Standards | Sep 2, 2020

California releases guide for state water policy

Water Resilience Portfolio is roadmap for meeting water needs as climate changes.

Codes and Standards | Aug 25, 2020

Platform will allow researchers to test energy system integration at scale

The U.S. Department of Energy’s (DOE’s) National Renewable Energy Laboratory (NREL) recently launched the Advanced Research on Integrated Energy Systems (ARIES) platform.

Codes and Standards | Aug 20, 2020

Wariness of elevators may stymie office reopening

Workers could balk at returning to high-rises.

Codes and Standards | Aug 18, 2020

Florida becomes the third state to adopt concrete repair code

Sets minimum requirements for design, construction, repair of concrete structural elements in buildings.

Codes and Standards | Aug 17, 2020

ASCE seeks comments on seismic standard

Pertains to design criteria for nuclear facilities.

Codes and Standards | Aug 13, 2020

COVID-19 reboot guide offers strategies for reopening K-12 schools

Looks at space considerations for reopening at different scales.

Codes and Standards | Aug 12, 2020

Document provides guidance for mass timber construction

Overview of Intl. Building Code requirements included.

Codes and Standards | Aug 11, 2020

Inefficient air conditioning is a key contributor to global warming

More efficient equipment and buildings could make a big difference.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021