flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

More than 90% of New York City schools have code violations

More than 90% of New York City schools have code violations

Nearly 60 schools had more than two dozen violations, according to a NY Daily News report.


By BD+C Staff | June 12, 2013

More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems at 1,100 school buildings with at least one open violation as of May 23.

“At the least, these violations are a distraction and a source of discomfort,” said a school cleaners’ union official. “And in many cases, they could actually present a health hazard.”

Which school had the most? Harlem's I.S. 195, with 124 violations. Nearly 60 schools had more than two dozen violations.

(http://www.nydailynews.com/new-york/education/90-city-schools-building-code-violations-article-1.1360851)

Related Stories

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â