The mayor of Montreal's Saint-Laurent borough wants Quebec's housing authority to speed up its plan to publish construction guidelines for green roofs. Housing authority Régie du bâtiment has yet to publish the standards. Without them, green roof projects in Montreal are subject to a six-month approval process.
Mayor Alan De Sousa says he has negotiated with developers to ensure that all new construction involves green roofs, and he wants the Régie du bâtiment to draft and publish its guidelines before that progress is lost. The current National Building Code of Canada does not include guidelines for green roofs. Each province is responsible for developing rules governing vegetative roofs.
Owen Rose, an architect and member of the Montreal Urban Ecology Centre, says regulations are making it increasingly difficult to include green roofs on new projects. "We shouldn't be building green roofs for Florida hurricanes, San Francisco earthquakes and Japanese tsunamis; we're living in Montreal, we have to adapt to our local climate," Rose told CBC news.
Montreal has granted some exceptions for the construction of green roofs for certain developments, including buildings that are less than three stories, residences under nine units, and some small commercial buildings. But on taller residential buildings, the Régie du bâtiment has the final say.
Related Stories
| Mar 30, 2012
Forest Stewardship Council critical of proposed LEED 2012 changes
According to the Forest Stewardship Council (FSC), the third draft of LEED 2012, if approved as written, would represent a step backward from the current Certified Wood Credit.
| Mar 22, 2012
Symposium on water efficiency: How much more water can be saved?
The Third International Emerging Technology Symposium by IAPMO and the World Plumbing Council features a session on water efficiency.
| Mar 22, 2012
Broker doesn’t have to inform contractor that insurer went broke, California court rules
A California appellate court ruled that an insurance broker did not have a duty to inform a subcontractor that a project’s insurer had gone bankrupt.
| Mar 22, 2012
Public agencies shouldn’t negotiate project labor agreements, says AGC official
When a public agency rather than the contractor negotiates a PLA with unions, it interferes with the right of employers and workers to reach their own agreements on working conditions and benefits, says Steve Isenhart, president of the Associated General Contractors of Washington.
| Mar 22, 2012
Proposed rule would let crane operators get licenses without prior city experience
The Bloomberg administration is considering letting operators of giant tower cranes get their license without requiring that they first run cranes as apprentices in the city for three years.
| Mar 22, 2012
Bill would reintroduce “opt-out” provision in lead paint law
The Lead Exposure Reduction Amendments Act of 2012 (S2148) would restore the "Opt-Out" provision removed from the Environmental Protection Agency's Lead Renovate, Repair and Painting (LRRP) rule in April 2010.
| Mar 15, 2012
New Florida building code establishes flood and storm surge provisions
The new 2010 code establishes minimum design and construction requirements to protect buildings from wind, rain, floods, and storm surges.
| Mar 15, 2012
Illinois city rejects international code due to home sprinkler requirement
Macomb, Illinois aldermen voted to recommend that the city not adopt 2012 international building and residential code standards requiring the installation of overhead sprinkler systems in newly constructed one-family and two-family homes.