flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Modeling tool helps compare options for HVAC systems when little known about a building

Codes and Standards

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.


By Peter Fabris, Contributing Editor | January 25, 2022
Commercial building

Courtesy Pixabay

Version 6.0 of the Building Efficiency System Tool (BEST), a commercial building HVAC system efficiency comparison application, is now available.

The Hydronic Industry Alliance-Commercial (HIA-C), a committee of the Radiant Professionals Alliance (RPA), recently released the update that helps compare options for HVAC systems at an early design stage when little information is known about the building. The tool can compare projected costs and energy usage for all HVAC systems and hot water consumption in any building “based on what is known before money is spent on selecting the HVAC and water heating systems, and (at a stage when) almost all inputs may be adjusted once the design process begins,” according to a news release.

The tool can model multiple heating and cooling sources including all electric systems using cascaded heat pumps and backup sources. “With the trend to all-electric solutions—including cascading heat pump systems—BEST is able to quickly and easily compare these innovative ideas,” says Greg Cunniff, P.E., director of Applied Solutions for Williams Comfort Products. “Legacy modeling software currently has a difficult time comparing these new ideas.”

The revised tool is available at no charge at: http://forms.iapmo.org/hiac/software_register.aspx

Related Stories

Codes and Standards | Jul 26, 2017

New ISO standard on video fire detectors will help identify fires more quickly

The standard marks the first comprehensive international specification for this equipment.

Codes and Standards | Jul 25, 2017

Geotechnical solutions prevent building distress due to expansive clay soils

The condition is the most common geologic hazard in the U.S.

Codes and Standards | Jul 24, 2017

Non-union labor gaining ground in New York City

President of contractors’ group says competitive pricing is spurring more open shops.

Codes and Standards | Jul 20, 2017

New tallest tower west of the Mississippi built to stringent seismic standards

L.A.’s new 1,100-foot skyscraper dominates city’s skyline.

Codes and Standards | Jul 19, 2017

Economic impacts of climate change will jump over next two decades

Average annual cost to buildings and infrastructure from eastern storms to rise by $7.3 billion.

Codes and Standards | Jul 18, 2017

Energy modeling yields accuracy within 4%, says new study

Results of the study support the usefulness of the practice.

Codes and Standards | Jul 13, 2017

Net Zero Energy rebranded as ‘Zero Energy’

ILF aims to make new certification the sole standard for highest performing buildings.

Codes and Standards | Jul 13, 2017

New York City creates $10 million fund to help women- and minority-owned firms win construction contracts

The money is earmarked for up to $500,000 surety bonds per contract.

Codes and Standards | Jul 12, 2017

New International Building Code allows weather-resistive barriers above 40 feet

Danger of propagating flames now deemed negligible.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021