flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Modeling tool helps compare options for HVAC systems when little known about a building

Codes and Standards

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.


By Peter Fabris, Contributing Editor | January 25, 2022
Commercial building

Courtesy Pixabay

Version 6.0 of the Building Efficiency System Tool (BEST), a commercial building HVAC system efficiency comparison application, is now available.

The Hydronic Industry Alliance-Commercial (HIA-C), a committee of the Radiant Professionals Alliance (RPA), recently released the update that helps compare options for HVAC systems at an early design stage when little information is known about the building. The tool can compare projected costs and energy usage for all HVAC systems and hot water consumption in any building “based on what is known before money is spent on selecting the HVAC and water heating systems, and (at a stage when) almost all inputs may be adjusted once the design process begins,” according to a news release.

The tool can model multiple heating and cooling sources including all electric systems using cascaded heat pumps and backup sources. “With the trend to all-electric solutions—including cascading heat pump systems—BEST is able to quickly and easily compare these innovative ideas,” says Greg Cunniff, P.E., director of Applied Solutions for Williams Comfort Products. “Legacy modeling software currently has a difficult time comparing these new ideas.”

The revised tool is available at no charge at: http://forms.iapmo.org/hiac/software_register.aspx

Related Stories

Codes and Standards | Jan 7, 2019

Program uses low-cost sensors to monitor impact of stormwater mitigation systems

University/municipal partnership in Philadelphia aims to improve green infrastructure design.

Codes and Standards | Jan 7, 2019

Washington, D.C., to transition to 100% renewable energy by 2032

Includes measures to reduce emissions from buildings and transportation.

Codes and Standards | Jan 4, 2019

Canada’s National Building Code will include climate change obligations

New durability requirements for new buildings in the works.

Codes and Standards | Jan 4, 2019

LEED v4.1 beta registration begins in January

First releases are O+M, BD+C, and ID+C.

Codes and Standards | Jan 3, 2019

U.S. Appeals Court says general contractors can be cited for subcontractor violations

Ruling will prompt review of OSH decision that said GCs cannot be held liable for subs’ violations.

Codes and Standards | Jan 3, 2019

Tall mass timber code changes receive final approval

New provisions to be included in the 2021 International Building Code.

Codes and Standards | Jan 2, 2019

ASHRAE’s Low-Rise Residential Buildings standard update now available

Performance measures are at least 50% more efficient than 2006 IECC.

Codes and Standards | Jan 2, 2019

Study compares labor hours for various low-slope roofing options

Type of roof covering, project parameters, tool management, and crew efficiency all impact profitability.

Codes and Standards | Dec 20, 2018

New York’s ‘Scaffold Law’ under fire for driving up project costs

Lawmakers under pressure to reform law that makes contractors 100% liable for work-site injuries.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021