Magnusson Architecture + Planning recently completed work on MLK Plaza, a 13-story, 167-unit affordable residential building in the Bronx. The development includes 25 studios, 57 one-bedroom units, 60 two-bedroom units, and 24 three-bedroom units. 100% of the apartments will be affordable to very low-income renters.
MLK Plaza residents will have access to recreation and community rooms, a rear patio, and a gym on the seventh floor with an adjacent outdoor terrace. The gym and terrace are part of active design interventions to encourage physical health. Their location on the seventh floor is midway between the top and bottom floors to encourage residents to use the stairs. The stairwells also incorporate active design principles such as double height landings and windows for natural light and views.
Photo credit: Miguel de Guzman / ImagenSubliminal.
See Also: Sweden’s tallest timber building is open for business
The exterior features dark gray brick as a nod to the neighborhood’s industrial past. Metal panels with a gold hue were also used on the exterior to provide a bright counterpoint to the brick. A fully-glazed double-height corner lobby is framed by diagonal columns. The lobby provides natural daylight to the ground floor during the day and creates street-level illumination at night. One of the lobby’s walls includes a mural of MLK.
The development was designed to achieve LEED Platinum.
Photo credit: Miguel de Guzman / ImagenSubliminal.
Photo credit: Miguel de Guzman / ImagenSubliminal.
Photo credit: Miguel de Guzman / ImagenSubliminal.
Photo credit: Miguel de Guzman / ImagenSubliminal.
Photo credit: Miguel de Guzman / ImagenSubliminal.
Photo credit: Miguel de Guzman / ImagenSubliminal.
Related Stories
| Oct 7, 2013
10 award-winning metal building projects
The FDNY Fireboat Firehouse in New York and the Cirrus Logic Building in Austin, Texas, are among nine projects named winners of the 2013 Chairman’s Award by the Metal Construction Association for outstanding design and construction.
| Oct 7, 2013
Reimagining the metal shipping container
With origins tracing back to the mid-1950s, the modern metal shipping container continues to serve as a secure, practical vessel for transporting valuable materials. However, these reusable steel boxes have recently garnered considerable attention from architects and constructors as attractive building materials.
| Oct 4, 2013
Sydney to get world's tallest 'living' façade
The One Central Park Tower development consists of two, 380-foot-tall towers covered in a series of living walls and vertical gardens that will extend the full height of the buildings.
| Oct 4, 2013
Mack Urban, AECOM acquire six acres for development in LA's South Park district
Mack Urban and AECOM Capital, the investment fund of AECOM Technology Corporation (NYSE: ACM), have acquired six acres of land in downtown Los Angeles’ South Park district located in the central business district (CBD).
| Sep 24, 2013
8 grand green roofs (and walls)
A dramatic interior green wall at Drexel University and a massive, 4.4-acre vegetated roof at the Kauffman Performing Arts Center in Kansas City are among the projects honored in the 2013 Green Roof and Wall Awards of Excellence.
| Sep 23, 2013
Six-acre Essex Crossing development set to transform vacant New York property
A six-acre parcel on the Lower East Side of New York City, vacant since tenements were torn down in 1967, will be the site of the new Essex Crossing mixed-use development. The product of a compromise between Mayor Michael Bloomberg and various interested community groups, the complex will include ~1,000 apartments.
| Sep 20, 2013
August housing starts reveal multifamily still healthy but single-family stagnating
Peter Muoio, Ph.D., senior principal and economist with Auction.com Research, says the Census Bureau's August Housing Starts data released yesterday hints at improvements in the single-family sector with multifamily slowing down.
| Sep 19, 2013
What we can learn from the world’s greenest buildings
Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.
| Sep 19, 2013
6 emerging energy-management glazing technologies
Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level.
| Sep 19, 2013
Roof renovation tips: Making the choice between overlayment and tear-off
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.