ACEC Colorado has awarded MKK Consulting Engineers, Inc. (MKK) a 2013 Engineering Excellence Award for Denver Department of Human Services Eastside Building. Stuart Monical, President and CEO of MKK stated, “This project gave us a great opportunity, not only to help repurpose an existing vacant site with a facility that serves the local community, but also provide a facility that is energy conscience as well as net-zero energy ready.”
The Denver Department of Human Services Eastside facility is a new 54,000-sf two-story office building. MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project. The high performance mechanical system included paring of a variable refrigerant volume (VRV) system for perimeter heating and cooling with an under floor air distribution (UFAD) system for building ventilation and internal space conditioning. This hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE 90.1-2004, even with a proposed 12% increase in window area over the project baseline. +
Related Stories
| Mar 5, 2012
Gilbane Building Co. wins top honors at ASA Houston awards ceremony
Gilbane was also named General Contractor of the Year for the seventh time in 11 years and won the inaugural Safety Program of the Year award.
| Mar 5, 2012
Franklin Institute in Philadelphia selects Skanska to construct new pavilion
The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.
| Mar 2, 2012
By the Numbers
66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs.
| Mar 1, 2012
Intelligent construction photography, not just pretty pictures
Our expert tells how to organize construction progress photos so you don’t lose track of all the valuable information they contain.
| Mar 1, 2012
AIA: A clear difference, new developments in load-bearing glass
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.