flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award

MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award

MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.


By Posted by Tim Gregorski, Senior Editor | December 4, 2012
The hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE
The hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE 90.1-2004, even with a proposed 12% increase in

ACEC Colorado has awarded MKK Consulting Engineers, Inc. (MKK) a 2013 Engineering Excellence Award for Denver Department of Human Services Eastside Building. Stuart Monical, President and CEO of MKK stated, “This project gave us a great opportunity, not only to help repurpose an existing vacant site with a facility that serves the local community, but also provide a facility that is energy conscience as well as net-zero energy ready.”

The Denver Department of Human Services Eastside facility is a new 54,000-sf two-story office building. MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project. The high performance mechanical system included paring of a variable refrigerant volume (VRV) system for perimeter heating and cooling with an under floor air distribution (UFAD) system for building ventilation and internal space conditioning. This hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE 90.1-2004, even with a proposed 12% increase in window area over the project baseline. +

Related Stories

| May 11, 2012

VFA to acquire Altus Group's Capital Planning division

Strategic move strengthens VFA's facilities capital planning market osition in North America.

| May 11, 2012

Betz promoted to senior vice president for McCarthy’s San Diego Office

He will oversee client relations, estimating, office operations and personnel as well as integration of the company’s scheduling, safety and contracts departments.

| May 11, 2012

CRSI appoints Brace chairman

Stevens also elected to board of directors and vice-chair.

| May 11, 2012

Dempster named to AIA College of Fellows

Altoon Partners’ technical and construction services leader honored for his contributions.

| May 11, 2012

AIA launches education and training portal

New portal to host Contract Documents training, education resources in one convenient place.

| May 10, 2012

Chapter 7 When Modern Becomes Historic: Preserving the Modernist Building Envelope

This AIA CES Discovery course explores the special reconstruction questions posed by Modern-era buildings.

| May 10, 2012

Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond

Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.

| May 10, 2012

Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction

Certification for existing buildings under these two rating programs has overtaken that for new construction.

| May 10, 2012

Chapter 4 Business Case for High-Performance Reconstructed Buildings

Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.

| May 10, 2012

Chapter 3 How Building Technologies Contribute to Reconstruction Advances

Building Teams are employing a wide variety of components and systems in their reconstruction projects.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021