flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award

MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award

MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.


By Posted by Tim Gregorski, Senior Editor | December 4, 2012
The hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE
The hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE 90.1-2004, even with a proposed 12% increase in

ACEC Colorado has awarded MKK Consulting Engineers, Inc. (MKK) a 2013 Engineering Excellence Award for Denver Department of Human Services Eastside Building. Stuart Monical, President and CEO of MKK stated, “This project gave us a great opportunity, not only to help repurpose an existing vacant site with a facility that serves the local community, but also provide a facility that is energy conscience as well as net-zero energy ready.”

The Denver Department of Human Services Eastside facility is a new 54,000-sf two-story office building. MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project. The high performance mechanical system included paring of a variable refrigerant volume (VRV) system for perimeter heating and cooling with an under floor air distribution (UFAD) system for building ventilation and internal space conditioning. This hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE 90.1-2004, even with a proposed 12% increase in window area over the project baseline. +

Related Stories

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

| Aug 14, 2012

SOM Foundation announces prize recipients for 2012

Submissions for the SOM Prize were received from students at 34 schools in the U.S.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

| Aug 9, 2012

DSGW Architects welcomes new employees

Three new employees located in DSGW's Duluth office.

| Aug 9, 2012

DMR Architects converts bank building to municipal court

The project consisted of a $4 million renovation to a 2-story building totaling 13,000-sf.

| Aug 8, 2012

BD+C wins six B2B journalism awards

BD+C wins two national awards, three regional awards, and a regional Graphical Excellence award.

| Aug 8, 2012

BIM’s future up in the cloud

The AEC industry is on the cusp of a still more significant evolution with cloud computing.

| Aug 8, 2012

Giants 300 Sports Facilities Report

BD+C's Giants 300 Top 25 AEC Firms in the Sports Facilities sector.

| Aug 8, 2012

Giants 300 Science & Technology Report

BD+C's Giants 300 Top 25 AEC Firms in the Science & Technology sector.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021