flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award

MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award

MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.


By Posted by Tim Gregorski, Senior Editor | December 4, 2012
The hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE
The hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE 90.1-2004, even with a proposed 12% increase in

ACEC Colorado has awarded MKK Consulting Engineers, Inc. (MKK) a 2013 Engineering Excellence Award for Denver Department of Human Services Eastside Building. Stuart Monical, President and CEO of MKK stated, “This project gave us a great opportunity, not only to help repurpose an existing vacant site with a facility that serves the local community, but also provide a facility that is energy conscience as well as net-zero energy ready.”

The Denver Department of Human Services Eastside facility is a new 54,000-sf two-story office building. MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project. The high performance mechanical system included paring of a variable refrigerant volume (VRV) system for perimeter heating and cooling with an under floor air distribution (UFAD) system for building ventilation and internal space conditioning. This hybrid mechanical system has an energy modeled savings of 40% beyond ASHRAE 90.1-2004, even with a proposed 12% increase in window area over the project baseline. +

Related Stories

| May 2, 2013

Holl-designed Campbell Sports Center completed at Columbia

  Steven Holl Architects celebrates the completion of the Campbell Sports Center, Columbia University’s new training and teaching facility.

| May 2, 2013

BIM group proposes uniform standards for how complete plans need to be

A nationwide group of Building Information Modeling users, known as the BIMForum, is seeking industry input on a proposed set of standards establishing how complete Building Information Models (BIMs) need to be for different stages of the design and construction process. 

| May 2, 2013

New web community aims to revitalize abandoned buildings

Italian innovators Andrea Sesta and Daniela Galvani hope to create a worldwide database of abandoned facilities, ripe for redevelopment, with their [im]possible living internet community.

| May 1, 2013

A LEGO lover's dream: Guide to building the world's iconic structures with LEGO

A new book from LEGO master builder Warren Elsmore offers instructions for creating scale models of buildings and landmarks with LEGO.

| May 1, 2013

New AISC competition aims to shape the future of steel

Do you have the next great idea for a groundbreaking technology, model shop or building that could potentially revolutionize the future of the steel design and construction industry? Enter AISC's first-ever Future of Steel competition.

| May 1, 2013

Data center construction remains healthy, but oversupply a concern

Facebook, Amazon, Microsoft, and Google are among the major tech companies investing heavily to build state-of-the-art data centers.

| May 1, 2013

Groups urge Congress: Keep energy conservation requirements for government buildings

More than 350 companies urge rejection of special interest efforts to gut key parts of Energy Independence and Security Act

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021