flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

MKA’s Embodied Carbon Action Plan will include reporting on carbon reductions for selected projects

Building Team

MKA’s Embodied Carbon Action Plan will include reporting on carbon reductions for selected projects

Firm will also continue developing open-source embodied carbon and Life Cycle Analysis tracking tools.


By Peter Fabris, Contributing Editor | May 17, 2022
Carbon Action Plan
Courtesy Pixabay.

Magnusson Klemencic Associates (MKA) recently released its SE 2050 Embodied Carbon Action Plan (ECAP) for 2022.
 

The plan contains two-dozen pledged action items including:


·       Track, measure, and report on material quantities and carbon footprint reductions for selected MKA projects, including two projects to be used as case studies for external publication, and four projects to be submitted to SE 2050 for inclusion in their database.
 
·       Engage in advancing and developing non-proprietary, open-source embodied carbon and Life Cycle Analysis (LCA) tracking tools. MKA will provide both in-kind and funding support toward the development of the OpenIMPACT Life Cycle Inventory database and the tallyCAT LCA tool.
 
·       Continue work by MKA’s in-house Sustainability Technical Specialist Team, which shares innovations, discusses strategies, reviews case study successes, and serves as a resource on embodied carbon reduction. MKA will make at least six presentations to industry peers to highlight advancements, foster collaboration, and challenge each other on reducing embodied carbon.
 
·       Create an embodied carbon guide to establish its approach toward measuring embodied carbon—from the materials procurement to construction to the Whole Building LCA.
 
Earlier this year, MKA, in collaboration with Hines, released the Hines Embodied Carbon Reduction Guide. Developed over two years, the free 108-page guide aims to create more sustainable development practices at Hines while establishing an industry standard for quantifying, tracking, and reducing embodied carbon in commercial real estate development. 

Related Stories

| Oct 4, 2012

2012 Reconstruction Awards Silver Winner: Allen Theatre at PlayhouseSquare, Cleveland, Ohio

The $30 million project resulted in three new theatres in the existing 81,500-sf space and a 44,000-sf contiguous addition: the Allen Theatre, the Second Stage, and the Helen Rosenfeld Lewis Bialosky Lab Theatre.

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.

Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.

| Oct 4, 2012

2012 Reconstruction Award Platinum Winner: Building 1500, Naval Air Station Pensacola Pensacola, Fla.

The Building Team, led by local firms Caldwell Associates Architects and Greenhut Construction, had to tackle several difficult problems to make the historic building meet current Defense Department standards having to do with anti-terrorism, force protection, blast-proofing, and progressive collapse.

| Oct 4, 2012

2012 Reconstruction Awards Platinum Winner: City Hall, New York, N.Y.

New York's City Hall last received a major renovation nearly a century ago. Four years ago, a Building Team led by construction manager Hill International took on the monumental task of restoring City Hall for another couple of hundred years of active service.

| Oct 4, 2012

BD+C's 29th Annual Reconstruction Awards

Presenting 11 projects that represent the best efforts of distinguished Building Teams in historic preservation, adaptive reuse, and renovation and addition projects.

| Oct 4, 2012

Integrated security systems—replacing legacy systems

To a large degree, building security is driven by the integration of a variety of electronic security systems. The market and engineering of these systems exploded in the post-9/11 era and has shown few signs of tapering off.

| Oct 4, 2012

Gilbane publishes Fall 2012 construction industry economic report

Report outlines fluctuation in construction spending; predicts continued movement toward recovery.

| Oct 3, 2012

Fifth public comment period now open for update to USGBC's LEED Green Building Program

LEED v4 drafts and the public comment tool are now available on the newly re-launched, re-envisioned USGBC.org website.

| Oct 2, 2012

Dow Business Services Center building named 2012 “America’s Best Buildings of the Year” winner

Building constructed with air sealing and insulation products from Dow Building Solutions.

| Sep 18, 2012

MKK opens office in North Dakota

MKK is currently working on seven projects in North Dakota, including a hotel, restaurant, truck stop, office building, and apartment complex.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021