flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use tower in China features world’s highest outdoor pool

Mixed-use tower in China features world’s highest outdoor pool

Tower’s faceted, fragmented geometry inspired by region’s mountains.


By Peter Fabris, Contributing Editor | November 7, 2022
Guangxi China Resources Tower ext 1
Photo: © Arch-Exist

Guangxi China Resources Tower, a new 403-meter-tall (1,322 feet) skyscraper in Nanning, China features the world’s highest outdoor pool—at 323 meters (1,060 feet) above grade. The tower is the 18th tallest building in China and the 37th tallest in the world.

The architecture was inspired by the crystalline forms associated with the mountains of Guangxi. The structure’s faceted and fragmented geometry provides a multitude of surfaces that reflect the changing light qualities of the tropical sky. The character of the tower changes throughout the day, mirroring the mood of the city.

Horizontal sunshades delicately extend across the façade in a consistent texture, shading the floor-to-ceiling glass of the building’s interior spaces. This simple clarity of the façade results in a cohesive legibility of its angular geometry and creates a bold contrast to both the lush vegetation of the region and the surrounding mixture of architectural styles, according to a news release from Goettsch Partners (GP), the project’s design architect.

The 86-story tower anchors a 900,000-square-meter multifunctional transit-oriented development of retail, commercial office, residential, and luxury hospitality. The high-rise totals 272,260 square meters, composed of the 336-key Shangri-La Nanning hotel, 172,740 square meters of office space, and 5,930 square meters of retail space.

Located on the lower floors, the office program is distinguished with a single-sided taper of the south façade that strategically reduces the floor plate depths as the tower rises in response to the stepping core. Atop the office volume, a dramatic shift in the building profile occurs as the hotel program emerges. A terrace at Level 71 caps the lower volume and creates a unique outdoor sky space, featuring the hotel pool. Dramatic views of the surrounding lakes, parks, and mountains extend in all directions, enlivened by the 180-degree view from sunrise to sunset.

The complex includes interconnected podium and basement floors that form a cohesive network of buildings optimized to benefit the larger master planned development. External sunshades and a high-performance façade enclosure system help to reduce energy loads while delivering natural light and exceptional views to all floors. Optimized mechanical systems maximize the efficiency to minimize energy and water consumption while creating a comfortable indoor environment.

On the Building Team:
Owner and/or developer: China Resources Land Limited (CR Land)
Design architect: Goettsch Partners
Architect of record: CCDI Group
MEP engineer: Parsons Brinkerhoff
Structural engineer: RBS Architectural Engineering Design Associates
General contractor/construction manager: China Construction Eighth Engineering Division

Guangxi China Resources Tower pool ext 2
Photo: © Arch-Exist
Guangxi China Resources Tower pool ext 3
Photo: © Arch-Exist
Guangxi China Resources Tower ext 4
Photo: © Arch-Exist

 

Related Stories

Building Team | Feb 25, 2016

Long-time BD+C editor Gordon Wright, 1939-2016

Gordon Wright, whose career at BD+C spanned 32 years, passed away on February 15, at the age of 76. 

Building Team | Feb 10, 2016

DBIA disputes study claiming design-build projects often delivered on time, over budget

Says study did not account for owner-initiated scope changes.  

Building Team | Jan 7, 2016

4 reasons the C-suite should care about design-led construction

Lou Astorino shares four examples how a unified approach can directly help C-suite leaders achieve their organizational goals.

Sponsored | Building Team | Dec 16, 2015

How to fix 3 common mistakes AEC teams make in project interviews

In a LinkedIn post, Scott Johnson, business writing specialist at Johnson Training Group, highlights three common missteps that AEC firms make during project interviews. His insights are based on more than 90 interviews conducted with members of various selection panels.

Sponsored | Building Team | Dec 7, 2015

Why employee advocacy is key to social media success

Employee advocacy is key to boosting social media engagement, and employee advocacy is about more than just the promotion of a firm’s brand.

Sponsored | Building Team | Nov 30, 2015

5 ways to bring data into marketing and business development

Here are five ways to use data to enhance the client acquisition process

Cultural Facilities | Nov 23, 2015

BIG plans for Pittsburgh: Bjarke Ingels’ Lower Hill District master plan evokes hilly topography

Paths will be carved to create a dialogue between Pittsburgh’s urbanscape and its hilly surroundings.

Sponsored | Building Team | Nov 17, 2015

The benefits of selling your firm to employees

One business advisor recommends professional services businesses to develop a group of employees who are willing and able to buy the business

Sponsored | Building Team | Nov 2, 2015

Recruiting for cultural fit

Hiring for culture fit doesn’t mean hiring people who are all the same

Building Team | Oct 28, 2015

Steven R. Zirkel named president of Metl-Span

Metl-Span announced that Steven R. Zirkel has joined the company as the new president. Metl-Span is an industry leader in providing insulated metal panel products for increasing usage in institutional, commercial, industrial and cold storage markets.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021