flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use residence for UCLA medical students completes

Multifamily Housing

Mixed-use residence for UCLA medical students completes

Lorcan O’Herlihy Architects designed the project.


By David Malone, Associate Editor | March 18, 2021
1500 Granville exterior at dusk

Photos courtesy Suffolk

Suffolk has recently completed the construction of 1500 Granville, a multifamily, mixed-use facility in West Los Angeles. The five-story, 174,000-sf complex is a new housing option for UCLA Medical’s House Staff (medical residents, fellows, and interns), medical graduate students, and other graduate students.

1500 Granville features 153 studio, one-bedroom, two-bedroom, and live-work units; 15,000-sf of retail; and 308 spaces of subterranean parking. Sixteen of the units are set aside as affordable. Residents will have access to a variety of indoor and outdoor gathering spaces including a clubhouse, co-working space, a gym, a pool area, BBQ, and multiple outdoor and courtyard areas for recreation.

 

1500 Granville interior

 

The ground floor retail and restaurant spaces feature multiple outdoor dining and recreation areas that connect the public building space to the surrounding community. These new spaces will look to create an “urban village” to engage the public stretch of roadway that has been known for speeding cars and heavy traffic.

The project is the final phase of a multi-block development that was previously occupied by car dealerships.

Related Stories

Multifamily Housing | Dec 12, 2016

BIG’s first residential condominium in the U.S. completed in Miami

Two 20-story twisting towers comprise 98 units on a three-acre site near Biscayne Bay.

Multifamily Housing | Dec 1, 2016

One of Canada’s largest media companies dives into real estate development

Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.

Multifamily Housing | Nov 28, 2016

Axiometrics predicts apartment deliveries will peak by mid 2017

New York is projected to lead the nation next year, thanks to construction delays in 2016

Sponsored | Multifamily Housing | Nov 11, 2016

Value engineering brings Santa Barbara apartments back on track

When framing estimates for a new apartment complex in Rialto, California, came in too high, a savvy developer decided to have the project value engineered. A switch to glulam and wood-framed shear walls got the project back in the black. 

Adaptive Reuse | Nov 9, 2016

Middle school transformed into affordable housing for seniors

The project received $3.8 million in public financing in exchange for constructing units for residents earning less than 60 percent of the area’s median income.

Multifamily Housing | Oct 28, 2016

Aston Martin is making a foray into real estate in Miami

The British automaker will partner with G and G Business Developments on the waterfront project.

Multifamily Housing | Oct 25, 2016

The Beacon will become the most sustainable residential tower in the world

Lumiere Developments says the building will generate enough energy to offer residents ‘Free Energy For Life.’

High-rise Construction | Sep 8, 2016

Construction on the tallest residential tower in western Europe could start early next year

China’s Greenland Group is the developer of four of the world’s 10 largest skyscrapers

High-rise Construction | Sep 6, 2016

Peddle Thorp Architects' solar-powered Melbourne high-rise looks to go off the grid

The skyscraper would be the first in Australia to incorporate solar cells in its façade.

Multifamily Housing | Aug 17, 2016

A new research platform launches for a data-deprived multifamily sector

The list of leading developers, owners, and property managers that are funding the NMHC Research Foundation speaks to the information gap it hopes to fill.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021